background image

HARTCOMM 

page 2 

 

HARTCOMM K03/0922 

We don’t accept warranty and liability claims neither upon this publication nor in 
case of improper treatment of the described products. 
 
The document may contain technical inaccuracies and typographical errors. The 
content will be revised on a regular basis. These changes will be implemented in 
later versions. The described products can be improved and changed at any time 
without prior notice. 

© Copyright 
All rights reserved. 

 
 
 

1.  Contents 

 

1.

 

Contents ........................................................................................................ 2

 

2.

 

Note .............................................................................................................. 3

 

3.

 

Instrument Inspection .................................................................................... 3

 

4.

 

Regulation Use ............................................................................................. 3

 

5.

 

Operating Principle ........................................................................................ 4

 

6.

 

Mechanical Connection ................................................................................. 4

 

7.

 

Electrical Connection .................................................................................... 4

 

7.1

 

Blockscheme ....................................................................................... 4

 

7.2

 

Wiring................................................................................................... 5

 

8.

 

Communication ............................................................................................. 5

 

9.

 

Maintenance ................................................................................................. 6

 

10.

 

Technical Information .................................................................................... 6

 

11.

 

Dimensions ................................................................................................... 6

 

12.

 

Disposal ........................................................................................................ 7

 

13.

 

EU Declaration of Conformance ................................................................... 8

 

 

 
 
 
 
 
 

Sold by: 

 

Kobold Messring GmbH 

Nordring 22-24 

D-65719 Hofheim 

Tel.: +49(0)6192-2990 

Fax: +49(0)6192-23398 

E-Mail: [email protected] 

Internet: www.kobold.com  

Summary of Contents for Hart HARTCOMM

Page 1: ...Operating Instructions for Hart modem Model HARTCOMM...

Page 2: ...oducts can be improved and changed at any time without prior notice Copyright All rights reserved 1 Contents 1 Contents 2 2 Note 3 3 Instrument Inspection 3 4 Regulation Use 3 5 Operating Principle 4...

Page 3: ...ee The devices are only to be used maintained and serviced by persons familiar with these operating instructions and in accordance with local regulations applying to Health Safety and prevention of ac...

Page 4: ...DEM provides interface connection between field devices slaves with HART and IBM compatible PC 6 Mechanical Connection Due to the test cable terminating in clips there is no need to disconnect the cab...

Page 5: ...oning of the clips is independent from the polarity HARTCOMM is not provided with surge protection thus the lightning protection of the relevant HART standard has to be used 8 Communication The HARTCO...

Page 6: ...premises 10 Technical Information Operating temperature 25 C 55 C Enclosure Polystyrene Connection to PC USB 1 1 B connector Cable to PC USB A B 1 8 m Connection to HART filed KLEPS 2 Spiral cable len...

Page 7: ...tional disposal regulations and environmental regulations Batteries Batteries containing pollutants are marked with a sign consisting of a crossed out garbage can and the chemical symbol Cd Hg Li or P...

Page 8: ...art 1 General requirements EN 61326 2 3 2013 Electrical equipment for measurement control and laboratory use EMC requirements Part 2 3 Particular requirements Test configuration operational conditions...

Reviews: