4-32
[
INSTALLING BUCKET
If O-ring (1) is cracked or has lost elasticity, replace it with a new one.
1
1
8
4
6
6
7
2,3
5
1.
Clean each pin and pin hole and grease it
sufficiently to make it slippery.
2.
Move the bucket cylinder to align the pin holes of
bucket (6) and bucket link (8) with each other, and
then insert pin (4).
3.
Raise the boom to slightly raise the bucket from the
ground.
4.
Move arm (7) to align the pin holes of bucket (6) and
arm (7) with each other, and then insert pin (5).
5.
Insert pin (3) and install retaining ring (2).
6.
Fit O-ring (1) in place.
7.
Apply grease to the grease nipples for each pin until the grease comes out through the gap between the pin
and the hole.
Copyright©2020 Kobelco Construction Machinery Co.,Ltd. All rights reserved. [S2YY00041ZE03] [0701CsCshWbYs]