• The power source connections should be local and accessible via a suitable IP rated enclosure
• Avoid installing in areas where water will sit on top of the fitting for long periods of time (see Fig 3)
• Ensure a minimum of 300mm drainage is put in
below the luminaire (see Fig 4).
Note: the drainage below the luminaire should be
able to drain the water away within 30 minutes
• Ensure there is enough cable below the fitting in
order to carry out maintenance work. The final
circuit connection should also be accessible
(see Fig 3, Fig 4 and Fig 5)
• Switch on the power and test for correct operation
Fig 2
LEDM06 series
These instructions should be read carefully and retained after installation by the end user for future reference and
maintenance.
These instructions should be used to aid installation of the following products:
LEDM06W / LEDM06B
SAFETY
•
Installation of this luminaire should only be carried out by a qualified electrician or competent person to the
latest Building and current IEE Wiring Regulations (BS7671)
•
Please isolate mains prior to installation/maintenance
•
Check the total load on the circuit (including when this luminaire is fitted) does not exceed the rating of the
circuit cable, fuse or circuit breaker
•
Please note the IP (Ingress of Protection) rating of this luminaire when deciding the location for installation
•
This product is Class II double insulated
•
This product is IP65 rated
•
This product is non-dimmable
INSTALLATION
•
Cut a suitable hole in the mounting surface as per the cut-out details (Fig 1) ensuring that it does not infringe
with electrical cables or water/gas pipes.
Fig 1
•
Provide power to the required point of installation. Suitable IP rated junction boxes should be used where
required
•
Ensure the power source is via an RCD or an RCBO
•
Connect the mains supply, Live (brown) and Neutral (blue) (see Fig 2)
Fig 2
•
The power source connections should be local and accessible via a suitable IP rated enclosure
32mm
Live (brown)
Neutral (blue)
•
Connect the mains supply, Live (brown), Neutral (blue) and Earth (green/yellow) (see Fig 3)
Fig 3
•
The power source connections should be local and accessible via a suitable IP rated enclosure
•
Avoid installing in areas where water will sit on top of the fitting for long periods of time (see Fig 4)
300mm
minimum
drainage
required
Loop cable to
allow for
maintenance
Pea shingle or
gravel for
drainage
230V AC
Mounting
Sleeve
Fig 4
Fig 5
Avoid installing
in areas with
likelihood of
flooding or
standing water
300mm
minimum
drainage
required
Live (brown)
Earth (green/yellow)
Neutral (blue)
Fig 3
Fig 4
Fig 5