Knightsbridge LEDM06 Series Installation & Maintenance Manual Download Page 3

• The power source connections should be local and accessible via a suitable IP rated enclosure
• Avoid installing in areas where water will sit on top of the fitting for long periods of time (see Fig 3)

•  Ensure a minimum of 300mm drainage is put in 

below the luminaire (see Fig 4).  
Note: the drainage below the luminaire should be 
able to drain the water away within 30 minutes

•  Ensure there is enough cable below the fitting in 

order to carry out maintenance work. The final 
circuit connection should also be accessible  
(see Fig 3, Fig 4 and Fig 5)

• Switch on the power and test for correct operation

Fig 2

LEDM06 series 

These instructions should be read carefully and retained after installation by the end user for future reference and 

maintenance. 

These instructions should be used to aid installation of the following products: 

LEDM06W / LEDM06B  

SAFETY 

 

Installation of this luminaire should only be carried out by a qualified electrician or competent person to the 

latest Building and current IEE Wiring Regulations (BS7671) 

 

Please isolate mains prior to installation/maintenance 

 

Check the total load on the circuit (including when this luminaire is fitted) does not exceed the rating of the 

circuit cable, fuse or circuit breaker 

 

Please note the IP (Ingress of Protection) rating of this luminaire when deciding the location for installation 

 

This product is Class II double insulated 

 

This product is IP65 rated 

 

This product is non-dimmable 

INSTALLATION 

 

Cut a suitable hole in the mounting surface as per the cut-out details (Fig 1) ensuring that it does not infringe 

with electrical cables or water/gas pipes. 

 

 

 

 

 

 

 

Fig 1  

 

 

Provide power to the required point of installation. Suitable IP rated junction boxes should be used where 

required 

 

Ensure the power source is via an RCD or an RCBO 

 

Connect the mains supply, Live (brown) and Neutral (blue) (see Fig 2) 

 

 

 

 

 

 

 

 

 

 

 

 

Fig 2 

 

The power source connections should be local and accessible via a suitable IP rated enclosure 

32mm 

Live (brown) 

Neutral (blue) 

 

 

Connect the mains supply, Live (brown), Neutral (blue) and Earth (green/yellow) (see Fig 3) 

 

 

 

 

 

 

 

 

 

 

 

 

Fig 3 

 

The power source connections should be local and accessible via a suitable IP rated enclosure 

 

Avoid installing in areas where water will sit on top of the fitting for long periods of time (see Fig 4) 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

300mm 

minimum 

drainage 

required 

Loop cable to 

allow for 

maintenance 

Pea shingle or 

gravel for 

drainage 

230V AC 

Mounting 

Sleeve 

Fig 4

 

Fig 5

 

Avoid installing 

in areas with 

likelihood of 

flooding or 

standing water

 

300mm 

minimum 

drainage 

required 

Live (brown) 

Earth (green/yellow) 

Neutral (blue) 

Fig 3

Fig 4

Fig 5

3

Reviews: