Page 7
Assembly Instructions
knightgroup.co.nz
Step 4
Step 1
Step 2
Step 3
Securely connect legs to rails lengths using the
M8x12mm dome head bolts.
To secure rails to
connectors place the rail onto the connector and
firmly tap the end of the rail with a rubber mallet.
Securely connect legs to rails widths using the
M8x20mm dome head bolts.
To secure rails to
connectors place the rail onto the connector and
firmly tap the end of the rail with a rubber mallet.
Slide the 2 way and 3 way connectors over each leg,
and securely lock into place using M8x20mm cap
head bolts.
Loosely connect the M8x20mm dome head bolt and
slot nut through the rail spacer bracket. Slide spacer
bracket onto rail, align to centre and tighten.
See
diagram below for number of spacer brackets and
placement based on rail measurement between legs.
Team Table
6 Legs - 3600 x 1200mm
Rail < 500mm = 0 Brackets
Rail > 500mm = 1 Brackets
Rail > 1600mm = 2 Brackets