background image

www.kmwcomm.com

                                                                                                                                                             

 

KMW Antenna Installation Guide   

Mounting kits for ET-X-TU-42-15-37-18-iR-RA

 

 

Step 3 

   

       

 

 

 

 

 

 

 

   

 

 

 

 

 

       

* Remove the second nut before tightening the first nut !!! 

 

 

 

   

 

 

       

* Tighten the first nut to the recommend torque then insert 

  the second nut and tighten second nut to the recommended torque 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

Loosen 4 points bolts to extend adjustable clamp 

Extend the adjustable clamp until the desired   

angle is reached using an angle indicator.   

Tighten all nuts with a torque of 

304lbf.in[350kgf.cm], first the inner nut and   

then the outer nut. 

Recommended torque   

for M8 NUT :   

304lbf.in [350kgf

.cm]

 

There must be no open gap 

between any parts of the 

bracket that require 

tightening.   

Caution!

Never use torque wrench on the   

second nut until the first nut is fully. 

tightened to the recommended torque 

specification!

 

KMW Communications Inc. 

Base Station Antennas 

For Mobile Communications

 

Reviews: