Installation Guide

 

2-3/4” (70 mm) 

 

3-1/2”

 (89 mm)

 

7/16”

 (11 mm)

 

 

1/4”

 (6 mm)

 thick foam gasket

 1-1/2”

 

(38 mm)

for SSS-101x

or

1-1/4”

 

(32 mm)

for SSS-100x

 3-5/32”

 

(80 mm) for SSS-10x2

5-13/32”

 

(137 mm) for SSS-10x3

7-21/32” (195 mm) for SSS-10x4

9-29/32”

 

(252 mm) for SSS-10x5

1/4" nipple 

(SSS-100x)

for 3/8" OD 

polyethylene 

tubing or 

3/16" nipple 

(SSS-101x) for 

1/4" OD tubing

Mounting Holes, 3/16” (5 mm)

Installation Guide

Differential Pressure Flow Pickup Tubes

SSS-1000 Series 

 

Mounting for Differential Pressure Flow

To mount the pickup tubes for differential pressure:
1. 

Determine the duct’s flow direction and install the 

pickup tubes based on the flow arrow imprint.

NOTE: 

The pickup tubes must be mounted with the 

FLOW arrow imprint pointing in the direction of 

the air flow.

2.  Cut a 7/8" (22 mm) hole in the duct to accept the pickup 

tubes.

3.  Attach the pickup tubes to the duct using two self-

tapping screws inserted through the 3/16" (5 mm) 

mounting holes.

Connections

Use appropriately sized polyethylene tubing to c

onnect the 

pickup tubes to the controller:
• 

For connecting SSS-10xx pickup tubes with CSC-3000 

series, CSP-4000/5000 series, KMD-7000 series, and 

BAC-7000/8000/9000 series controllers, use a barb 

union adapter and tubing sized appropriately to the 

pickup tubes and controller. For maximum accuracy in 

the CSP-5000 series, KMD-7000 series, and BAC-7000 

series controllers, the 3/8" OD tubing between the 

pickup tubes and the adapter should be as short as 

possible, and the 1/4" OD tubing from the adapter to 

the controller should be 24" long (on both the High and 

the Low sides).

• 

OR use the equivalent SSS-101x pickup tubes and just 

1/4" OD tubing (no adapter is necessary). For maximum 

accuracy in the CSP-5000 series, KMD-7000 series, and 

BAC-7000 series controllers, the 1/4" OD tubing from 

the pickup tubes to the controller should be 24" long 

(on both the High and the Low sides).

NOTE: 

For other controllers, the length of the tubing 

should not be longer than necessary.

NOTE: 

CSC-2000 series controllers have ports for 3/8" 

tubing (the same as the SSS-10xx pickup tubes).

Check that there are no sharp bends in the tubing at any 

connection. Bends and creases may leak as tubing ages.
1.  Connect the Port “H” to the “High” input on the VAV 

controller.

2.  Connect the Port “L” to the “Low” input on the VAV 

controller.

1-3/8” (35 

mm) 

1

-3/8” (35 

mm) 

Drill two holes for self-tapping screws inserted through 

the pickup tubes’ 3/16” (5 mm) mounting holes.

Cut 7/8” 

(22 mm) 

diameter

NOTE:

  This installation guide is for installing SSS-10xx models. For guidance in installing SSS-111x models, 