![KLS Martin independant Fix Bridge Instructions For Use Manual Download Page 18](http://html1.mh-extra.com/html/kls-martin/independant-fix-bridge/independant-fix-bridge_instructions-for-use-manual_1978989018.webp)
18
8
Cleaning and Maintenance
8.1
Required Maintenance
If inside the power unit are installed flexible prepping, you can find inspection points on the pendant and
the suspension structure, in order to guarantee a proper inspection.
We recommend a regular inspection every 6 months. Flexible prepping replacement every 8 years is
required. The new flexible prepping must be conform to standards laid down by EN ISO 5359.
After installation, tests must be perform in order to match standards laid down by EN ISO 7396-1 and
EN ISO 7396-2.
8.2
Recommended Maintenance
We recommend to check the following list every 6 months.
•
Correct operation of the brake system (LEDs, movement and braking correct)
•
Possible motorized movement (silent/check the lubrication of the worm screw, check the operation of
the limit switch)
•
Correct operation of the swivel joint (silent, vibration free)
•
Case matching (without opening)
•
Operation of electrical sockets, fuses, gas sockets, accessories
8.3
Cleaning
The painting or anodic oxidation guarantee the durability of the external surfaces of the headboards.
Cleaning must be done using a soft cloth slightly moistened with non-alcoholic disinfectants but non-
abrasive detergent. Do not use active solvents to clean the plastic parts.
Summary of Contents for independant Fix Bridge
Page 11: ...independant Fix Instructions for Use Revision 01 11 6 Functioning...
Page 12: ...independant Fix Instructions for Use 12 Revision 01...
Page 13: ...independant Fix Instructions for Use Revision 01 13...
Page 14: ...independant Fix Instructions for Use 14 Revision 01...
Page 15: ...independant Fix Instructions for Use Revision 01 15...