18
EN
Board Deflation Steps
1. Clear any water or debris out of the valve areas.
2. Slowly press down on the valve stem to start letting air out of the board.
There will be an initial burst of air, but that will slow down very quickly.
Once the air flow has slowed down, press the valve stem all the way down
and turn it clockwise to lock it into the “open” position.
Center Fin Installation
1
2
Slide fin base into fin box.
Slide fin all the way to back of the fin box.
3
4
Insert fin retention pin through slot.
Correct fin installation.