background image

Summary of Contents for 4KUIS185S

Page 1: ...I I I ...

Page 2: ...rs out 4 Slide the wood panel into the door frame 5 Replace the top of the panel assembly NOTE Make sure the galvanized panel is replaced in back of the panel assembly DOOR LOWER BIN PANEL 11 Y ll y e 285 mm 303 mm c I WOOD PANEL DIMENSIONS 43 mm A FIGURE 1 REMOVE ALL DOOR INSULATION RIBS TO ACCEPT WOOD PANEL THICKNESS FIGURE 2 THERMOSTAT CALIBRATIONS If ice maker is installed above two thousand f...

Page 3: ...Y OR DRIP 70 F H 1 BEST RANGE CR 66 A 1 Place unit so the front side will be completely unobstructed to provide proper air flow 2 Area should be well ventilated with temperature above 55 JF 12 6 and below llOOF 43 4OC Best results are obtained between 7OOF 21 lOC and gOOF 32 2OC 3 Provision for electricity water and drain connections should be determined 4 Tne uni may be closed in on the iop and t...

Page 4: ... before making the final connection to the inlet of the water valve to prevent possible water valve malfunction Do not discard shunt that is removed from After the cabinet is in place bend the tubing to meet the connection at the water valve The garden hose threaded compression fitting is found in the parts bag This joint provides a convenient disconnect for service Be sure the tubing is clear of ...

Page 5: ...his appliance is equipped with a power supply cord having a 3 prong grounding plug To minimize possible shock hazard the cord must be plugged into a mating 3 prong grounding type wall receptacle grounded in accordance with all governing codes and ordinances If a mating wall receptacle is not available it is the personal responsibility and obligation of the customer to have a properly grounded 3 pr...

Page 6: ...ns GROUND ASSEMBLY ATTACH TO GROUNDED COLD IlWTER PIPE MUST BE GROUND CLAMP TIGHT ON PIPE ELECTRICALLY GROUNDEDCOLD WATER PIPE REMOVE PAINT etc GROUND WIRE 6 4 EYELET 2 SCREW GROUNDING _ il 3 PRONG GROUNDING PLUG 1 0I a u 0 POWER SUPPLY CORD FIGURE 7 WAL f L RECEPTACLE HOW IT WORKS 0 Compressor runs 0 Condenser fan runs 0 Water pump runs circulates water 0 Cutter grid is warm to touch WHEN THE DES...

Page 7: ...o the Use and Care Guide 0 Before starting wash out interior of cabinet with a Baking Soda solution 2 tablespoons soda to a quart of warm water Rinse thoroughly 0 Make certain the water is turned on 0 Turn switch to the ON position IMPORTANT Allow unit to run for 3 hours before expecting ice and for 24 hours before trying to set the thickness control If installed above 2 000 feet altitude see page...

Page 8: ... Water will not enter pump pan until freezing plate gets cold and machine goes into a harvest cycle Check for even water flow over freezing plate Unit must be level for proper operation Check for desired cube thickness and after 24 hours adjust if necessary Maximum ice yield will be obtained with ice thickness at l 2 12 mm to 518 16 mm Replace grill KitchenAid is a registered trademark of KitchenA...

Reviews: