IOM/i_HT Issue Date: 26/06/2009
Page 24 of 50
Last Revision:26/10/2009
Isolate the equipment before any maintenance work is done. Switch off the mains
supply, remove fuses, apply lockouts where applicable and affix suitable isolation
warning signs to prevent inadvertent re-connection.
In order to avoid the possibility of maintenance personnel inhaling dangerous fumes or
vapours, it is recommended that maintenance work be carried out away from the
pump location by removal of the rotating unit assembly to a suitable maintenance
area.
6.2
Routine Maintenance Chart
Preventive maintenance schedule is a periodical checks and precautions by which
possibilities of failure and breakdown will be rare.
EVERY WEEK
Visually check for leaks
Check for vibration.
Adjust gland as necessary to maintain slight leakage.
Hand test bearing housing for any sign of temperature.
Voltage and current.
EVERY MONTH
Check bearing temperature with thermometer.
EVERY 3 MONTHS
Check grease lubricated bearings for saponification.
EVERY 6 MONTHS
Check the packing and replace if necessary.
Check shaft or shaft sleeve for scoring.
Check alignment of pump and motor.
Check holding down bolts for tightness.
Check coupling bush/rubber star.
EVERY YEAR
Check rotating element for wear.
Check wear ring clearances.
Clean and regrease bearings.
Measure total suction and discharge Head as a test of pipe connection
7
OVERHAULING
With normal daily operating spell, the pump will be due for overhaul after about 5000
working hours. This work should be done by skilled personnel. Please refer to the cross
sectional drawing while dismantling and reassembling the pump. Please also refer to
chart given at end of this booklet.
Single Stage Pump
7.1 Dismantling Procedure:
1.
Remove drain plug (60100) and drain the pump by opening air vent valve
(45000).
Summary of Contents for i-HT
Page 1: ...INSTRUCTIONS ON INSTALLATION OPERATION AND MAINTENANCE FOR KIRLOSKAR PUMP TYPE i HT...
Page 2: ......
Page 12: ...IOM i_HT Issue Date 26 06 2009 Page 12 of 50 Last Revision 26 10 2009...
Page 31: ...IOM i_HT Issue Date 26 06 2009 Page 31 of 50 Last Revision 26 10 2009...
Page 33: ...IOM i_HT Issue Date 26 06 2009 Page 33 of 50 Last Revision 26 10 2009...
Page 36: ...IOM i_HT Issue Date 26 06 2009 Page 36 of 50 Last Revision 26 10 2009...
Page 37: ...IOM i_HT Issue Date 26 06 2009 Page 37 of 50 Last Revision 26 10 2009...
Page 38: ...IOM i_HT Issue Date 26 06 2009 Page 38 of 50 Last Revision 26 10 2009...
Page 40: ...IOM i_HT Issue Date 26 06 2009 Page 40 of 50 Last Revision 26 10 2009...
Page 41: ...IOM i_HT Issue Date 26 06 2009 Page 41 of 50 Last Revision 26 10 2009...
Page 42: ...IOM i_HT Issue Date 26 06 2009 Page 42 of 50 Last Revision 26 10 2009...
Page 43: ...IOM i_HT Issue Date 26 06 2009 Page 43 of 50 Last Revision 26 10 2009...
Page 44: ...IOM i_HT Issue Date 26 06 2009 Page 44 of 50 Last Revision 26 10 2009...
Page 45: ...IOM i_HT Issue Date 26 06 2009 Page 45 of 50 Last Revision 26 10 2009...
Page 46: ...IOM i_HT Issue Date 26 06 2009 Page 46 of 50 Last Revision 26 10 2009...
Page 47: ...IOM i_HT Issue Date 26 06 2009 Page 47 of 50 Last Revision 26 10 2009...