
6-4 KL135
Transporting a Loaded Bucket
Transport material with the bucket as low as possible to prevent
spilling and keep maximum stability. The loader must be in a posi-
tion that will not block the operators’ vision. a loaded bucket must
not be transported in the upright position or at excessive speed.
Observe the following safety warning when transporting a loaded
bucket.
WARNING
Contact with overhead power lines can cause severe
electrical burns or death from electrocution. make sure
there is clearance between raised equipment and over
head power lines.
A loaded Bucket should be transported in a low position
at low ground speeds. Make turns slowly and use the
tractor brakes cautiously. A full bucket in the raised posi-
tion alters the center of gravity location of the machine
and increases the possibility of accidents.
CAUTION
When using a loader, be aware of bucket location at all
times. When raising a loader with bucket rolled back, ma-
terial can dump onto tractor causing damage to tractor
or injury to operator.
Stop the loader arms gradually when lowering or lifting.
Do not stand, walk or work under a raised loader unless
it is securely blocked or held in position. Accidental
movement of a control lever or leak in th hydraulic sys-
tem could cause the loader to drop, or attachment to
dump, resulting in serious injury or death.
Scraping
When scraping, the Boom lever must be used to keep the bucket
on the ground horizontally. The bucket must be kept level to the
ground during scraping operations.
Backfilling/Backgrading
When “Backfilling” or “Backgrading”, position the bucket so it is
level on the ground. Do not dump material from bucket following
each pass, as additional weight of material in bucket will assist in
“Backgrading” and increases loader efficiency during “Backfilling”.
Controlled Rate of Loader Functions
By “feathering” the control lever, reduced operational speeds can
be controlled. This action controls the position of the valve spool in
the valve body and regulates flow of oil to/from cylinders. It is im-
portant utilize this operational practice when lowering loader boom
when the bucket is loaded with material.
KL135-06.indd 4
2013-02-01 오전 11:19:59
Summary of Contents for KL135
Page 4: ...KL135 00 indd 4 2013 02 01 11 15 35...
Page 6: ...KL135 00 indd 6 2013 02 01 11 15 35...
Page 8: ...KL135 00 indd 8 2013 02 01 11 15 35...
Page 9: ...1 Safety Precautions KL135 01 indd 1 2013 02 01 11 16 32...
Page 12: ...KL135 01 indd 4 2013 02 01 11 16 32...
Page 13: ...2 Safety DECALS KL135 02 indd 1 2013 02 01 11 17 41...
Page 16: ...KL135 02 indd 4 2013 02 01 11 17 41...
Page 17: ...3 Loader Specifications KL135 03 indd 1 2013 02 01 11 18 16...
Page 20: ...KL135 03 indd 4 2013 02 01 11 18 17...
Page 21: ...4 INTRODUCTION KL135 04 indd 1 2013 02 01 11 18 46...
Page 23: ...5 TRACTOR PREPARATION KL135 05 indd 1 2013 02 01 11 19 13...
Page 26: ...KL135 05 indd 4 2013 02 01 11 19 14...
Page 27: ...6 LOADER OPERATION KL135 06 indd 1 2013 02 01 11 19 58...
Page 32: ...KL135 06 indd 6 2013 02 01 11 20 00...
Page 33: ...7 LOADER REMOVAL KL135 07 indd 1 2013 02 01 11 24 11...
Page 36: ...7 KL135 130O301A 135O703B KL135 07 indd 4 2013 02 01 11 24 13...
Page 37: ...8 LOADER MOUNTING KL135 08 indd 1 2013 02 01 11 24 55...
Page 40: ...KL135 08 indd 4 2013 02 01 11 24 56...
Page 41: ...9 LUBRICATION AND MAINTENANCE KL135 09 indd 1 2013 02 01 11 25 30...
Page 44: ...KL135 09 indd 4 2013 02 01 11 25 31...
Page 45: ...10 TROUBLESHOOTING KL135 10 indd 1 2013 02 01 11 26 49...
Page 52: ...KL135 10 indd 8 2013 02 01 11 26 49...
Page 53: ...11 HYDRAULIC SYSTEM SCHEMATIC KL135 11 indd 1 2013 02 01 11 27 48...
Page 55: ...12 TORQUE TIGHTENING CHARTS KL135 12 indd 1 2013 02 01 11 28 26...
Page 58: ...KL135 12 indd 4 2013 02 01 11 28 27...
Page 59: ...13 PART ILLUSTRATIONS KL135 13 indd 1 2013 02 18 4 57 02...
Page 103: ...14 LOADER INSTALLATION KL135 14 indd 1 2013 02 01 11 31 21...
Page 109: ...15 INDEX 1 KL135 15 index1 indd 1 2013 02 06 1 16 17...
Page 115: ...15 INDEX 2 KL135 15 index2 indd 5 2013 02 06 1 17 04...
Page 123: ...15 INDEX 3 KL135 15 index3 indd 9 2013 02 01 11 34 35...