41
Dat
e o
f inspection
Exp
ansion v
es
sel
se
tting be
for
e filling
Sy
st
em pr
es
sur
e
Exp
ansion v
es
sel
se
tting aft
er filling
Flo
w r
at
e
An
tifr
ee
ze le
vel
pH r
eading
Inspection o
f b
arium
ge
tt
er - v
ac
uum
tube
s only
Engineer de
tails
Prin
t name
Sign Telephone No
.
Additional notes for Australia and New Zealand
The collector must be installed in accordance with the requirements of AS/NZS 3500.4 Plumbing
and drainage - Heated water services or, in New Zealand by Building Code Clause NZBC G12.
The installer should note that it is recommended to place a properly drained safe-tray under
collectors, heaters or tanks where leakage would be likely to cause any damage.
For potable water installations, water characteristics should be in accordance to the table below.
Variable
Acceptable Range / Maximum Concentration
Supply Pressure
1.5 – 6 Bar
pH
6.5 - 8
Water Velocity
< 1.0 m/s
Hardness
20 – 60 ppm
Chloride to Hardness ratio
0.5
For complete system installations: Please refer to individual manuals for the setting of any boost
controllers or adjustable thermostats.
Hail protection covers are not applicable: The glass is compliant to Collector Testing Appendix
C, Section C5, Glass Breakage Safety Test (AS/NZS 2712: 2007). Warning: In the event of a
breakage. The replacement of vacuum tubes should be carried out by qualified installers only.
The collector glazing can be cleaned using a mains pressure garden hose and washing detergent
(High pressure washers should not be used).
Important Guidance for the Republic of Ireland
(Note: Varisol Collectors are not NSAI agrement compliant.) Solar installations in the Republic
of Ireland must be installed in accordance with the Irish Agrément Board certificate No. 10/0345,
which takes precedence over this installation document.
NSAI Agrément (Irish Agrément Board) is designated by Government to issue European Technical
Approvals.
NSAI Agrément Certificates establish proof that the certified products are ‘proper materials’
suitable for their intended use under Irish site conditions and in accordance with the Building
Regulations 1997 to 2011.
Certificate No. 10/0345 details the installation requirements and extends to every aspect of
the installation. NSAI Agrement compliant roof kits are supplied with their own installation
instructions, not contained in this manual, also available upon request.
Agrement compliant roof kits are available including joist hangers for the additional roof supports
required.
Readers are advised to check that this Certificate has not been withdrawn or superseded by
contacting NSAI Agrément, NSAI, Santry, Dublin 9 or online at:
http://www.nsai.ie/modules/certificates/uploads/pdf/IAB100345.pdf
Important Guidance for UK and Northern Ireland (NI)
In order to comply with the new MCS012 requirements in the UK and NI, MCS012 compliant kits
should be used. For more info contact us on
+44 (0) 28 3836 4520 or email [email protected].