Kingsman FDV200 Installation Instructions Manual Download Page 32

Parts List -200ZDV 

 

Product 

Number 

 

    Description 

 
FDV200   

 

FREE STANDING DIRECT VENT GAS STOVES: 

 

 

 

Free Standing Direct Vent Gas Stove, Listed for USA/Canada as a Gas Fired 

 

 

 

Direct Vent Room Heater, Includes Dual Burner, Ceramic Glass, On/Off Switch 

 

 

 

Glowing Ember Rock, Hi/Lo SIT Valve, with 100% Safety Shut Off, Four & Seven inch Flue,  

 

 

 

30,000 BTU NG, 26,000 BTU LP 

 
FDV200N  

 

Leg Stove - Natural Gas -Millivolt- Painted Black 

FDV200LP  

 

Leg Stove - Liquid Propane - Millivolt- Painted Black 

FDV200PN  

 

Pedestal Stove - Natural Gas - Millivolt- Painted Black 

FDV200PLP  

 

Pedestal Stove - Liquid Propane - Millivolt- Painted Black 

FDV200NE  

 

Leg Stove - Natural Gas -IPI- Painted Black 

FDV200LPE  

 

Leg Stove - Liquid Propane - IPI- Painted Black 

FDV200PNE  

 

Pedestal Stove - Natural Gas - IPI- Painted Black 

FDV200PLPE  

 

Pedestal Stove - Liquid Propane - IPI- Painted Black 

 

 

 

LOG SET: (REQUIRED FOR EACH UNIT) 

LOGC200  

 

Log Set - Cast Split Oak with Embers 

   ACCESSORIES: 

F35FK    

 

Fan Kit w/Variable Speed Control (Temperature Sensing) 

FDV200RL  

 

Refractory Liner 

Z1MT    

 

Thermostat Millivolt Wall Mount 

Z80PT    

 

Thermostat Programmable Digital Millivolt Wall Mount (1 F80-40) 

Z1RC    

 

Remote Control Millivolt (On/Off with LED) (Model I) 

ZART    

 

Remote Control Thermostat Millivolt (Model K) 

RMCBN   

 

Remote Control - Basic - Natural Gas (On/Off, Hi/Lo Flame Adjustment) 

RMCBP   

 

Remote Control - Basic - Liquid Propane (On/Off, Hi/Lo Flame Adjustment) 

FV7FBT 

  Decorative 

Brass 

Collar 

7" 

F7DBC    

 

Decorative Black Collar 7" 

F7DTP    

 

Decorative Black Wall Trim Plate 

OFP42SA   Spark 

Assist 

VENTING KITS AND COMPONENTS 

 

 

 

VENTING ACCESSORIES - (For Direct Vent Stoves) 

FDVHSK  

 

Horizontal Vent Starter Kit - (Direct Vent Stoves) 

   Starter 

Kit 

Contains: 

 

 

 

 

Horizontal Vent Termination, Zero Clearance Wall Sleeve, Black Wall 

 

 

 

Trim Ring, 7" Dia. Black Pipe 24" Length, 7" Dia. Black Pipe 48"Length 

 

 

 

7" - 90 Degree Black Elbow, 4" Flex 48" Unexpanded (96" Expanded) 

 

 

 

7" Brass Bands, (2) 7" Black Bands, Mill Pac. 

FDVVSK  

 

Vertical Vent Starter Kit - (Direct Vent Stoves)

 

   Starter 

Kit 

Contains: 

Attic Insulation Shield, Fire Stop, Ceiling Trim Plate, 

 

 

 

Trim Ring, Black Trim Ring, Roof Support, Spacer Springs(6), Mill Pac 

   VENTING 

ACCESSORIES: 

FDVVT40  

 

Vertical Vent Termination Converts from 15’ -40’ to 15’ and under 

FDVHT 

 

  Horizontal 

Vent 

Termination 

FDVHSQ  

 

Horizontal Square Termination 

ZDVST    

 

Horizontal Snorkel Termination (34" Tall, 24" Center to Center) 

FDVHSC  

 

Safety Cage for Horizontal Termination 

FDV48P  

 

Black Pipe (7" Diameter x 48") 

FDV36P  

 

Black Pipe (7" Diameter x 36") 

FDV24P  

 

Black Pipe (7" Diameter x 24") 

FDV12P  

 

Black Pipe (7" Diameter x 12") 

FDVE90  

 

Black Elbow (7" Diameter x 90 Degree) 

FDVE45  

 

Black Elbow (7" Diameter x 45 Degree 

ZDVAIS 

 

  Attic 

Insulation 

Shield 

ZDVVOS  

 

Offset Support 

ZDVFS 

 

  Firestop 

Spacer 

ZDVRS 

 

  Roof 

Support 

ZDVSS 

 

  Siding 

Shield 

ZDVWT   

 

Wall Thimble (Horizontal Venting) 

ZDV48GP  

 

Galvanized Pipe 7" Dia. x 48" (Vertical Installations) 

ZDV4FP8  

 

Flex Pipe 4" Diameter (4' Unexpanded to 8' Expanded) 

32

Summary of Contents for FDV200

Page 1: ...Horizontal installations the venting must be a minimum of one foot vertical off the flue before going horizontal Installation Instructions Model Number FDV200 FDV200P Free Standing Direct Vent Gas St...

Page 2: ...sed with the installations e g marble tile and the adhesives used to adhere this product to the walls can react with heat and cause odours It is recommended that you burn your gas fireplace or stove f...

Page 3: ...Panel Kit 11 Installation Instructions for LOGC200 12 Optional Fan Kit Installation 13 Millivolt System Lighting and Burner Control 14 Burner System Maintenance 15 Conversion Kit Instructions Part A...

Page 4: ...stallation of appliance or venting For required venting components see venting installation in appropriate section of this manual 4 THE FDV200N FDV200PN FDV200LP and FDV200PLP MAY BE INSTALLED IN MANU...

Page 5: ...the appliance 15 Installation and repair should be done by a qualified service person The appliance should be inspected before use and at least annually by a professional service person More frequent...

Page 6: ...A 720 2005 Edition B A carbon monoxide detector shall be located in the room that houses the appliance or equipment and shall Be powered by the same electrical circuit as the appliance or equipment su...

Page 7: ...liance may be installed directly on carpeting tile or other combustible material with no additional floor protection being required This unit has been tested in a Alcove the minimum size of Alcove is...

Page 8: ...IG 3 5 KPa 9 The appliance must be isolated from the gas supply piping system by closing its individual shutoff valve during any pressure testing of the gas supply piping system at test pressures equa...

Page 9: ...DV200 FDV200P NG LP GAS SPECIFICATIONS 9 35 51 3 8 FULL OPEN GAS INLET SIZE 3 8 SIT FUEL GAS MAXIMUM INPUT CONTROL BTU HIGH LOW NATURAL GAS MILLIVOLT 30 000 20 000 PROPANE GAS MILLIVOLT 26 000 20 000...

Page 10: ...paper cardboard coal be used in this appliance NOTE it is normal for your gas stove to give off some odour the first time it is burned This is due to the curing of the paint and any undetected oil fr...

Page 11: ...k clip out of the way and position side brick against rear brick panel and side of firebox Now swing clip onto panel and tighten screw 4 Install log set and glass door WARNIING Do not operate applianc...

Page 12: ...n picture and slide Log 3 forward up to the locating tabs 3A 3B Do not place log on top of tabs Step 4 Place Log 4 onto notched areas of Logs 1 3 Step 5 Place Log 5 up against 2nd Grate Bar from the l...

Page 13: ...it reaches operating temperature in approximately 10 to 15 minutes the fan will turn on The fan can be switched off if desired by turning the switch fully counter clockwise 6 Once the fan has started...

Page 14: ...above on this label If you don t smell gas then go to the next step 7 Now push in the control knob slightly and turn 4 counter clockwise to the PILOT position 8 Push in the control knob all the way a...

Page 15: ...peration Flame should appear similar to the above picture Conversion Kit Instructions PART A Kit Number Description Pilot Orifice Burner Orifice Brass 1000 255 Brass Nipple Air Shutter Hi Lo Regulator...

Page 16: ...to convert the valve from one type of fuel to the other Step 8 Check for gas leaks around the pilot burner tube and face of valve Step 9 Attach conversion label to label plate on bottom of unit writi...

Page 17: ...e new injector is proper for the application The injector size is stamped on the side of the injector near the top LPG injectors have a groove machined around their circumference near the top while NG...

Page 18: ...Gas Conversion for Modulator PART C WARNING WARNING 18...

Page 19: ...the remote Contrary to this feature is a Manual HI LO Control Knob The Modulating Servo Motor requires the Remote system to be present Backup Battery Pack This component permits the IPI system to oper...

Page 20: ...ol wiring harness instead of the main IPI harness From the Remote wiring harness use its male plug in connector and connect it to the female plug in in the main IPI harness Now the circuit is complete...

Page 21: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 21...

Page 22: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 22...

Page 23: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 23...

Page 24: ...ent LIGHTING INSTRUCTIONS 1 STOP Read the above safety information on this label 2 Remove batteries from Receiver and or Battery Backup Pack 3 Turn off all electric power to the fireplace 4 This firep...

Page 25: ...inches 45cm N Clearance to perpendicular wall 24 inches 60 cm Recommended to prevent re circulation of exhaust products For additional requirements check local codes V NOTE Clearances are to the edge...

Page 26: ...ing and Simpson Duravent venting Minimum clearances on venting 4 to top of elbow 2 1 2 from top of horizontal pipes 1 on all other existing pipes REMEMBER THAT A 1 4 VERTICAL RISE IS REQUIRED FOR EVER...

Page 27: ...um stove performance HOW TO USE THE VENT TABLE 1 Determine the height of the system and the number of elbows required 2 Use the Venting Chart to determine the maximum horizontal distance allowed Total...

Page 28: ...sealant MIL PAC SEALANT IS RECOMMENDED to the pipe and secure it with the 4 screws washers If two pieces of 4 flex pipe are to be joined the joint must be siliconed and secured with four 4 screws Befo...

Page 29: ...be unavoidable is when installing the vent terminal Note Do not remove or move spacer springs attached to 4 inner flex pipe these must be used to assure an 1 1 4 air gap between 4 and 7 pipes Minimum...

Page 30: ...VENTING AIR INTAKE PLATE ADJUSTMENT NOTE Unit comes preset for vertical venting under 15 feet Follow these instructions when venting exceeds 15 feet vertical 1 Locate the 3 x 1 4 hex screws and using...

Page 31: ...e an offset in order to avoid cutting of joists and to clear other obstructions When using 45 elbows an elbow support is required directly above the highest elbow When installing a bend in a joist are...

Page 32: ...ane On Off Hi Lo Flame Adjustment FV7FBT Decorative Brass Collar 7 F7DBC Decorative Black Collar 7 F7DTP Decorative Black Wall Trim Plate OFP42SA Spark Assist VENTING KITS AND COMPONENTS VENTING ACCES...

Page 33: ...si Nut Electrode Universal Bushing 974 144 1000 214 Piezo Igniter 1244 17 Mark21 1000 P136WR Generator GOA1 524 1000 255 Orifice Burner VALVE SYSTEM PARTS IPI System Electronic Ignition Remote Control...

Page 34: ...tch If okay jumper wires across wall switch wires at valve If burner comes on wires are faulty or connections are bad Generator may not be Check generator with millivolt meter Take reading at generato...

Page 35: ...th service or maintenance h damage repairs inoperation or inefficiency resulting from faulty installation or application i electricity or fuel costs or any increase in electricity or fuel cost whatsoe...

Reviews: