70
MINIMUM DISTANCE FROM
PILLAR TO CENTRE HINGE
5.2 BOX INSTALLATION PROCEDURE
6 OPERATOR AND LEVERS
Dig a hole big enough to hold the box
containing the operator.
B
A
380
160
320
6.1 ASSEMBLING
Place the operator in the box and fasten
it with the nuts provided.
Insert the ball in the pin located on the box and
fit the gate anchorage lever (L1).
Insert the tubes for water drainage in the
prepared holes (A) Insert the sheath for laying
the power cables and limit switch (B).
Note: while positioning the box, keep in
mind the minimum distance there must be
between the pillar and the centre of rotation
of the gate hinge.
Cement so that the box cannot be moved,
wait for it to dry and then assemble the
operator and levers.
L1
6
7