background image

                               

KTM-4B-25

       

DI-4B-25  

TORQUE 

 CHECKER  

 

 
                                                                                                                                                                                                 

 

 

12

 

4. Preparation and the measuring method   

4.1 The connection method 
  A detector input terminal and detector output terminal is connected in attached cable code. 
  Each terminal should unite a concavo-convex part and insert it. 
  Insert especially a detector output terminal until it pushes firmly the black part portion 
  of the cable terminal upper part with a finger and sounds it. 
  And when you remove a detector output terminal, pinch the silver portion with cable 
  terminal and extract. 
 
4.2 Installation 
  Since a detector may be brandished at the time of high torque measurement, 
  a detector should use a fixed hole etc. and fix it firmly. 
  A bodystand is in the reverse side of a indicator. A indicator can be made slanting 
  if a bodystand is stood. 
 
4.3 A setup in the measuring mode 
  The 3 following modes can be chosen with the setting measuring MODE switch in the   
  measuring mode. It unites with the use purpose and please choose. 
  (1) PP (peak measurement)  :  The maximum under measurement is always displayed. 
                                                      A setting of torque value can be used in this mode. 
                          *PP measurement operates from 30 or more numerical value. 
  (2) TR(track measurement)  :  The value of the load torque concerning detector is displayed   
                                                      as it is. 
  (3) PD(peak down                :  Value when load torque value changes from a rise to descent 
                        measurement)      is displayed. When you apply re-load, carry out after pushing 
                                                      a clear button. 
             
4.4 A setup of the measuring direction 
  Set up the measurement directions L (left) or R (right) with DIRECTION switch. 
 
4.5 Measuring method 

(1)  Turn on POWER switch.   

*Switch operation is a push type and is pushed for about 1 second (At the time of OFF). 

  (2) It checks that the display part is zero. If it is not zero, measuring MODE select switch is set 

      to TR, push CLEAR key, and perform zero adjustment. 
(3) It is set as the time which wants to count the number of blows with a COUNT TIME 
      setup switch.(▲▼)      About a blow count : It counts how many times it hit within fixed time. 
                                                  The abnormalities of a tool can be judged by managing the number. 
(4) It is measurement start, when a tool to measure into a detection part is set 
      and load torque is applied. 
(5) It checks that operation of a tool has been completed normally, the measurement torque value 
      of a display part is read, and it is a measurement end. 
(6) After a measurement end, if CLEAR key are pushed, 
      a display will be cleared by zero. When continuing measurement, it repeats from (2). 

Summary of Contents for DI-4B-25

Page 1: ...TORQUE CHECKER MODEL KTM 4B 25 DI 4B 25 DIGITAL TORQUE CHECKER INSTRUCTION MANUAL OTW Q08...

Page 2: ...KTM 4B 25 DI 4B 25 TORQUE CHECKER 2 1 1 2 24 3 4 5 6 7 8 9 10 11 12 13 14...

Page 3: ...KTM 4B 25 DI 4B 25 TORQUE CHECKER 3 15 16 17 18 19...

Page 4: ...220 44 74 CLE AR I N D C 220 0 lbf in 250 0 kgf c m 25 00 N m D I 4B 2 5 lbf in C AP A C ITY M AX sec C O U NT T I ME SET T I ME CLE AR ZER O A D J T O R Q UE TES TE R RESET P O WER TR PP P D C C W C...

Page 5: ...25 DI 4B 25 N m 0 50 25 00 kgf cm 5 0 250 0 lbf in 5 0 220 0 500 5000 0 5 30 499 3 4 PP peak TR track PD peak down RS232C 9600Baud 6VDC Ni Cd 1 2V 5cells 5 lbf in kgf cm N m 8 13 300 AC120V AC230V 50...

Page 6: ...4 1 4 2 1 PP peak 2 TR track 3 PD peak down 4 3 1 1 2 0 MODE TR Clear 3 Count Time ST 4 DIRECTION R L 5 2 6 7 Clear 0 2 4 4 1 INDI OFF TIME 2 0 0C 1 3 3 1 0 0 3 0 0 0C 0 0C 0 1C 0 5C 1 0C 1 5C 2 0C 2...

Page 7: ...KTM 4B 25 DI 4B 25 TORQUE CHECKER 7 5 P P P D RS 232C RS 232C 6 Clear 7 10 L 8 8 9 10 PP PD Auto clear Auto clear Auto clear 10digit 0 0C ON LO BATT AC SYSTEM RESET TR CLEAR 0...

Page 8: ...and vibrate this product Avoid disassembling the product that is a precise instrument If the torque meter is damaged by excessive shock or vibration the product may not only show the full performance...

Page 9: ...rmal Replace parts according to the instruction manual 17 Have the product repaired by the specialized dealer Do not modify this product Repair should be made always by the dealer where you purchased...

Page 10: ...tch INDI OFF TIME CLEAR key COUNT TIME setup switch AC ADAPTOR terminal Socket UNIT switch 90 7 200 220 44 74 CLE AR I N D C 220 0 lbf in 250 0 kgf c m 25 00 N m D I 4B 2 5 lbf in C AP A C ITY M AX se...

Page 11: ...Return to zero by pressing clear button Data transfer Option Serial interface RS232C Baud rate 9600 Power Supply 6VDC Ni Cd chargeable battery 1 2V 5cells Auto power save 5 minutes no use automatical...

Page 12: ...tes from 30 or more numerical value 2 TR track measurement The value of the load torque concerning detector is displayed as it is 3 PD peak down Value when load torque value changes from a rise to des...

Page 13: ...orresponding to RS 232C or a personal computer etc Spec All data 21 Data bit length Start bit 1 data bit 8 stop bit 2 NO parity Baud rate 9600bps Connector form D Sub 9pin Spec Connector spec No 3 pin...

Page 14: ...tem reset button is in the inside of a main part 8 Guarantee It is allowed to fix gratuitously if the fault which will originate in manufacture transportation etc of our company within one year after...

Page 15: ...the setting item of an auto clear function again When you do not use an auto clearance please set it as 0 0C The situation of torque tester Even if it turns on a power supply switch a power supply wi...

Reviews: