PFX2512
25
1
Ge
ne
ra
l D
e
sc
ri
p
ti
o
n
Procedure from System Configuration to Charge/Discharge Testing
To perform a charge / discharge test, configure a system with the PFX2512, DC power supplies,
electronic loads, and PC, and control the system using application software BPChecker3000.
The following procedure describes the main steps to configure a system, set test conditions, and
start and stop tests.
Connecting devices to configure a system
1
Connect power cords to each device.
2
Set the vibration sensor using the S1 switch of the PFX2512.
To use several PFX2512s, set channel numbers using the S1 switch before
connecting them to DC power supplies and electronic loads.
3
Remove the terminal cover attached to the input/output terminal board on
the rear panel of the PFX2512.
4
Connect the PFX2512 to the DC power supplies.
Use the cable with a solderless terminal which comes with the PFX2512 as a standard
accessory.
5
Connect the PFX2512 to the electronic loads.
Use the cable with a solderless terminal which comes with the PFX2512 as a standard
accessory.
6
Configure the DC power supplies.
Configure the protection function (OVP / OCP) and external analog control, and lock
the panels.
7
Configure the electronic loads.
Configure the protection function (OCP), slew rate, external analog control, and the
master unit and slave units during parallel operation, and lock the panels.
8
Connect the PFX2512 to a PC.
See
See
Terminal cover
Remove the terminal cover
See
See
See
See
See
Summary of Contents for PFX2500 Series
Page 12: ...12 PFX2512 This page is intentionally blank ...
Page 62: ...62 PFX2512 This page is intentionally blank ...
Page 71: ...Specifications This chapter provides the PFX2512 s specifications and outline drawing ...
Page 96: ...96 PFX2512 This page is intentionally blank ...
Page 140: ...140 PFX2512 Troubleshooting This page is intentionally blank ...
Page 143: ......