35
Operating Instructions
SEG
5 Mounting and dismounting
3. If necessary, prepare the cable for electrical connec-
(see Chapter 4: „Technical data", page 21)
.
5.4.2
Mechanical mounting
1. Place the new pull-rope emergency stop switch on
the substructure. Ensure that the installation position
is correct
(see Section 4.7: „Installation location and
installation position", page 30)
2. Apply a suitable threadlock product to the screws.
3. Fix the pull-rope emergency stop switch to the sub-
structure using two suitable screws and washers
inserted through the oblong holes (
13
)
Penetration of dirt and moisture!
Only use cables with approved cable cross-sections,
otherwise dirt and moisture can penetrate the device
and damage it. The approved cable cross-sections are
specified in
Chapter 4: „Technical data“, page 21
.
!
Fig. 5-2:
Pull-rope emergency stop switch
4
9
9
11
9
9
13
13