
Step 22
Note: Install T-nuts first!
Hardware
1 x
5/16 x 4-1/2”
(LW2, FW2, TN2)
1 x
5/16 x 2”
(FW2 x 2, LN2)
G8
G8
G5
Step 21: Attach Swing To Fort
Note: Install T-nuts first!
hammer, 1/2" socket
icon
Hardware
1 x
1 x
5/16 x 4-1/2” Hex Bolt
(
LW2,
FW2
,
TN2
)
5/16 x 2” Hex Bolt
(
FW2
x2,
TN2
)
G8
G5
FW2
FW2
TN2
LN2
LW2
FW2
G5
1757
2
2
1
54
Summary of Contents for BILT F26415EDB
Page 38: ...Step 14B Hardware 4 x 8 x 1 2 FW3 S5 S5 FRONT FW3 S5 S5 S5 S5 38...
Page 39: ...FRONT 3x S5 FW3 Step 14C Hardware 3 x 8 x 1 2 FW3 S5 FW3 S5 S5 S5 S5 39...
Page 48: ...Step 19C Step 18c Canopy Roof Assembly cont 48...
Page 49: ...S5 S5 S5 S5 S5 S5 S5 S5 S5 Hardware 8 x 8 x 1 2 FW3 S5 Step 19D FW3 49...