
FRONT
Step 11c: Floor Back Assembly
2x LS3 (FW1)
2x S7 (FW0)
Step 12C
1 x
1 x 5 x 38-1/2”
Hardware
Wood Parts
2 x
#12 x 2” (FW0)
2 x 1/4 x 3” (FW1)
S7
1768
LS3
FRONT
Step 11c: Floor Back Assembly
2x LS3 (FW1)
2x S7 (FW0)
1768
1768
S7
S7
S7
LS3
LS3
LS3
FW1
FW0
Pre-drill all pilot holes using a
1/8” drill bit before installing
the lag screws.
Predrill Pilot Holes for Lag Screw
Predrill 1/8”
pilot hole
Use factory drilled
hole as a guide
33
Summary of Contents for BILT F26415EDB
Page 38: ...Step 14B Hardware 4 x 8 x 1 2 FW3 S5 S5 FRONT FW3 S5 S5 S5 S5 38...
Page 39: ...FRONT 3x S5 FW3 Step 14C Hardware 3 x 8 x 1 2 FW3 S5 FW3 S5 S5 S5 S5 39...
Page 48: ...Step 19C Step 18c Canopy Roof Assembly cont 48...
Page 49: ...S5 S5 S5 S5 S5 S5 S5 S5 S5 Hardware 8 x 8 x 1 2 FW3 S5 Step 19D FW3 49...