![KGN pillinger SE200 Operating & Maintenance Download Page 9](http://html.mh-extra.com/html/kgn-pillinger/se200/se200_operating-and-maintenance_1962728009.webp)
0208 681 0097
9
Operating & Maintenance
SEM & SE200ES Pressurisation
Set
Electrical Connections
➢
The incoming supply must be sized to carry the motor full load current of the pump
(as shown on duty plate).
➢
All electrical connections are to be made against the relevant product wiring diagrams.
➢
All electrical connections should be sized, installed and protected in accordance with the
requirements of the latest safety standards and any other current local rules and regulations.
➢
It’s essential that this equipment is earth bonded to the building earth system.
Controller Connections
All electrical connections must be made by a qualified electrical
in accordance with all local regulations and standards.