
3-48 Keysight N5224B/25B Service Guide
Tests and Adjustments
Adjustments
3-
2.
Follow the instructions and prompts as they are displayed.
Receiver Adjustment
The receiver calibration is used to adjust the network analyzer receivers for a
flat response across its full frequency range:
1.
A power meter/sensor is connected to Port 1, as shown in
, to
establish a reference for flatness.
2.
A cable is inserted between the power sensor and the test port, as shown
in
, to establish a reference for the cable.
3.
The same cable is connected between test port 1 and test port 2, as
, and a signal from Port 1 is used to adjust the “B”
receiver at Port 2.
The adjustment is repeated using a signal from Port 2 to adjust the “A”
receiver at Port 1.
Data obtained during this adjustment are stored in the mxcalfile_pxx files in
flash memory on the test set motherboard, with a backup copy stored on the
hard disk drive. The data are used in subsequent measurements.
Solid state drives can be swapped or replaced without concern for the
mxcalfile_pxx files. If the test set motherboard is replaced, the PNA firmware
will automatically create new primary mxcalfile_pxx files from the backup
copies on the hard drive.
These files can be recreated by performing another receiver calibration
adjustment.
Equipment Used for the Receiver Adjustment
Procedure
1.
Connect the equipment as shown in
. Connect a GPIB cable
between the network analyzer and the power meter.
Equipment Type
Model or
Part Number
Alternate Model Part
Number
Power meter
E4418B/E4419B
E4418A/E4419A
Power sensor, 2.4 mm
8487A
None
Adapter, 2.4 mm (f) to 2.4 mm (f)
11900B
85056-60007
RF Cable, 2.4 mm (f) to 2.4mm (f)
85133C
85133E
Summary of Contents for N5224B
Page 3: ...3...
Page 4: ...4...
Page 12: ...12 Keysight N5224B 25B Service Guide Contents...
Page 84: ...3 52 Keysight N5224B 25B Service Guide Tests and Adjustments Adjustments 3...
Page 145: ...Keysight N5224B 25B Service Guide 4 61 Troubleshooting This page intentionally left blank...
Page 220: ...5 58 Keysight N5224B 25B Service Guide Theory of Operation Power Supply Group Operation 5...
Page 490: ...6 270 Keysight N5224B 25B Service Guide Replaceable Parts Replaceable Parts Listings 6...
Page 613: ...Installation Note Xxxxx xxxxx 3...