27/44
Scienlab Regenerative AC Emulator
–
Keysight SL1200A Series
–
Operating Instructions
Connection and Assembly 3
Connection of DUT (device under test) (output)
Connection of AC mode
To ensure that EMC limit values are adhered to, it is important that the shielding
of the EMC cable feedthrough fully surrounds the shielding of the cable.
Connecting load lines
The cables to the load connections and to the voltage measurement of the
DUT are routed via a cable gland plate underneath the output box of the
SL1200A, and connected via the corresponding terminal strips.
The cables must be connected to the DUT.
Refer to the enclosed circuit diagram for the detailed terminal assignment.
Connection of AC LV load lines (SL1201
–
SL1203)
•
Connection according to circuit diagram of the SL1200A
•
From left to right: L1, L2, L3, N
•
Separate bolt for PE
•
Ring cable lug connections
•
Tightening torque: see circuit diagram
Connection of AC HV load lines (SL1212, SL1213)
•
Connection according to circuit diagram of the SL1200A
•
From left to right: L1, L2, L3, N
•
Separate bolt for PE
•
Ring cable lug connections
•
Tightening torque: see circuit diagram
Connecting sense lines
Connection of sense lines, AC HV + LV
•
Connect to the fuses according to circuit diagram
•
Measure DUT voltage U
sense
•
From left to right: L1, L2, L3, N
•
Wire end ferrules
Additional DC mode connection (optional)
The function in DC mode can be added in addition to the AC operating
mode. The cables to the load connections and to the voltage measure-
ment of the DUT are routed via a replaceable cable gland plate under-
neath the output box of the SL1200A, and connected via the correspond-
ing terminal strips.
The cables must be connected to the DUT.
NOTE
Summary of Contents for SL1200A Series
Page 2: ......