
Test Considerations
For optimum performance, all calibration procedures should comply with the following:
l
Ambient temperature is stable, within 23 °C ±2°C.
l
Ambient relative humidity is less than 80%.
l
30 minute warm-up period before verification or adjustment.
l
Cables as short as possible, twisted or shielded to reduce noise.
Calibration Procedure
Enter Calibration Mode
Front Panel Menu Reference
SCPI Command
Select
System\Admin\Login
.
Enter your password in the Password field. Then press
Select
.
Voltage Programming and Measurement Calibration
Step 1. Connect the voltage input of the Keysight 3458A DMM to the output (see
).
Step 2. Select the voltage programing and measurement calibration.
Front Panel Menu Reference
SCPI Command
Select
System\Admin\Cal\Vprog
.
Check that the voltmeter is connected and select
Next.
Specify the full-scale voltage range. Full scale ranges vary
by model. This selects the 1000 V range:
Step 3. Select the first voltage calibration point. Measure the output voltage with the DMM and enter
the data.
Front Panel Menu Reference
SCPI Command
Display shows: “Enter P1 measured data”. Enter the data
from the external DMM. Press Enter when done.
CAL:LEV P1
*OPC?
CAL:DATA <data>
The next step applies 70% of the rated voltage of the unit under test to the output.
Step 4. Select the second voltage calibration point. Wait 5 minutes for the temperature to settle.
Measure the output voltage with the DMM and enter the data.
Front Panel Menu Reference
SCPI Command
Display shows: “Enter P2 measured data”. Enter the data
from the external DMM. Press Enter when done. Press
Back to finish.
CAL:LEV P2
*OPC?
CAL:DATA <data>
Keysight N69100 Series Operating and Service Guide
237
6 Verification and Calibration