12 Installation Note N5225-90117
Description of the Upgrade
Installation Procedure for the Upgrade
-
Installation Procedure for the Upgrade
The network analyzer must be in proper working condition prior to installing
this option. Any necessary repairs must be made before proceeding with this
installation.
Overview of the Installation Procedure
“Step 1. Obtain a Keyword and Verify the Information.”
“Step 2. Remove the Outer Cover.”
“Step 3. Remove the Inner Cover.”
“Step 4. Remove the Front Panel Assembly.”
“Step 5. Remove the A23 Test Set Motherboard.”
“Step 6. Remove Some Bottom-Side (Test Set) Cables.”
“Step 7. Remove the A27 Mixer Brick Assembly.”
“Step 8. Assemble the A28 Mixer Brick Assembly.”
“Step 9. Install the A27/A28 Mixer Brick Assemblies.”
“Step 10.Assemble the A34 and A35 Receiver Coupler Assemblies.”
“Step 11. Install the A34 and A35 Receiver Coupler Assemblies.”
“Step 12. Assemble the A33 - A36 Test Port Coupler Assemblies.”
“Step 13. Install the LED Boards and Test Port Coupler Assemblies to the
4-Port Test Set Front Plate.”
“Step 14. Install the 4-Port Coupler Plate Assembly to the Deck.”
“Step 15. Assemble and Install the A12 and A13 40 GHz Doubler Assemblies.”
“Step 16. Install Bracket to A10 Source Assembly.”
“Step 17. Assemble the A10 26.5 GHz Source 2 Assembly.”
“Step 18. Install the A10 26.5 GHz Source 2 Assembly and Cables.”
“Step 19. Install the A17 13.5 GHz (Source 2) Synthesizer Board and Cables.”
“Step 20. Install the Cable Bracket Mount.”
“Step 21. Install the Test Set Cables.”
“Step 22. Secure the Front Panel Bulkhead Connectors.”
This installation requires the removal of the analyzer’s protective
outer covers. The analyzer must be powered down and
disconnected from the mains supply before performing this
procedure.