3-10 Keysight N5224A/25A Service Guide
Tests and Adjustments
ANSI/NCSL Z540.3–2006 and ISO/IEC 17025 Verification
3-
ANSI/NCSL Z540.3–2006 and ISO/IEC 17025 Verification
To meet the criteria for ANSI/NCSL Z540.3–2006 and ISO/IEC 17025, perform
the preliminary checks and all performance tests
without stopping to repair or
adjust
1
. Refer to
for test flow. Print data at the completion of all the
tests, even if you are aware that the analyzer did not pass. If there is a failure,
complete the verification before you troubleshoot, repair, and adjust. After the
failure has been corrected, repeat the entire set of performance tests and
generate a new set of data.
Figure 3-1
ANSI/NCSL Z540.3–2006 and ISO/IEC 17025 Verification Flowchart
1. Stop only in case of a catastrophic failure or cable connector damage