background image

Keysight E8363B/C and E8364B/C Installation Note                                                                                                 25

General Information
Installation Procedure for the Upgrade Kit

Figure 15 

Front Panel Assembly Reinstallation

The previous figure and the figure below show the E8363/4B front panel 

and floppy disk drive. The E8363/4C front panel has a slightly different 

appearance and does not include a floppy disk drive.

Summary of Contents for E8364-60108

Page 1: ...Keysight For E8363B C and E8364B C PNA Series Microwave Network Analyzers Source Attenuators and Bias Tees Upgrade Kit Upgrade Kit E8364 60108 Installation Note...

Page 2: ...e Software to U S government customers under its standard commercial license which is embodied in its End User License Agreement EULA a copy of which can be found at http www keysight com find sweula...

Page 3: ...Required for Post Upgrade Adjustments 6 Step 1 Remove the Outer Cover7 Step 2 Remove the Front Panel Assembly Option 014 Only 8 Step 3 Raise the Receiver Deck10 Step 4 Remove the Existing Cables11 St...

Page 4: ...h test and measurements needs and information on finding a local Keysight office are available on the Web at www keysight com find assist If you do not have access to the Internet please contact your...

Page 5: ...is provided through two rear panel BNC connectors These inputs are fused for protection IMPORTANT Option UNL can only be installed on analyzers with the option combinations listed below as Products af...

Page 6: ...ep attenuator 1 E8364 20055 W52 RF cable A22 switch splitter to A37 step attenuator 1 E8364 20056 W55 RF cable A38 bias tee to A25 test port 1 coupler 1 E8364 20167 W56 RF cable A39 bias tee to A26 te...

Page 7: ...6 test port 2 coupler to PORT 2 CPLR ARM 1 E8364 20044 W71 RF cable RCVR R2 IN to A29 channel R2 mixer 1 E8364 20155 W81 RF cable A36 step attenuator to PORT 1 SOURCE OUT 1 E8364 20053 W82 RF cable A3...

Page 8: ...handling components and assemblies always use a grounded conductive table mat while working on the instrument always wear a heel strap when working in an area with a conductive floor If you are uncert...

Page 9: ...on Qty Part Number T 8 TORX driver set to 5 in lbs 1 N A T 10 TORX driver set to 9 in lbs 1 N A T 20 TORX driver set to 21 in lbs 1 N A 5 16 inch torque wrench set to 10 in lbs 1 N A 5 16 inch torque...

Page 10: ...handles item by loosening the screws item on both ends until the handle is free of the analyzer 3 With a T 20 TORX driver remove the four rear panel feet item by removing the center screws item 4 Sli...

Page 11: ...emove the six front panel semirigid jumper cables item 2 With a T 10 TORX driver remove the eight screws item from the sides of the frame 3 Slide the front panel over the test port connectors The figu...

Page 12: ...ont panel interface ribbon cable item from the A3 front panel interface board The front panel is now free from the analyzer Figure 3 Front Panel Assembly Removal The figure above shows the E8363 4B fr...

Page 13: ...on a flat surface 2 With a T 10 TORX driver remove the four screws item that secure the receiver deck 3 Pull the latch pin item towards the opposite side of the analyzer to release the receiver deck 4...

Page 14: ...HOUT Option 014 Refer to Figure 5 for the following procedure Remove the following cables W7E8364 20025A23 detector to A28 channel R1 mixer W8E8364 20026A24 detector to A29 channel R2 mixer W5E8364 20...

Page 15: ...ng cables W63E8364 20073PORT 1 CPLR THRU to A25 test port 1 coupler W61E8364 20081A22 switch splitter to PORT 1 SOURCE OUT W64E8364 20074PORT 2 CPLR THRU to A26 test port 1 coupler W62E8364 20082A22 s...

Page 16: ...1 CPLR THRU to A25 test port 1 coupler W61E8364 20081A22 switch splitter to PORT 1 SOURCE OUT W67E8364 20156A25 test port 1 coupler to PORT 1 CPLR ARM W64E8364 20074PORT 2 CPLR THRU to A26 test port...

Page 17: ...14 Keysight E8363B C and E8364B C Installation Note General Information Installation Procedure for the Upgrade Kit 1 Figure 7 Cable Removal Analyzers with Options 014 and 081...

Page 18: ...With a 5 16 inch torque wrench disconnect remove and keep for reinstallation later the two semirigid cables item from each detector For analyzers without Option 014 installed one of these cables has...

Page 19: ...ecessary 5 Using a T 8 TORX driver attach one bias tee to each bracket using two M2 5 x 14 screws provided for each The bias tees mount beneath the detectors Be careful to position the bias tees so th...

Page 20: ...16 motherboard P2 SRC ATT W52E8364 20056A22 switch splitter to A37 step attenuator W51E8364 20055A22 switch splitter to A36 step attenuator W8E8364 20175Channel R2 detector to A29 channel R2 mixer W7E...

Page 21: ...re The new parts are listed in Table 1 on page 3 1 Install the following cables in the order listed Ribbon cable 8121 0819A36 step attenuator to A16 motherboard P1 SRC ATT Ribbon cable 8121 0119A37 st...

Page 22: ...tenuator to PORT 2 SOURCE OUT W84E8364 20040PORT 2 CPLR THRU to A39 bias tee W81E8364 20053A36 step attenuator to PORT 1 SOURCE OUT W83E8364 20039PORT 1 CPLR THRU to A38 bias tee 2 Route the bias tee...

Page 23: ...ep attenuator W71E8364 20015REFERENCE 2 RCVR R2 IN to A29 channel R2 mixer W99E8364 20154A45 reference switch to A28 channel R1 mixer W56E8364 20168A39 bias tee to A26 test port 2 coupler W55E8364 201...

Page 24: ...Keysight E8363B C and E8364B C Installation Note 21 General Information Installation Procedure for the Upgrade Kit Figure 12 Cable Installation Analyzers with Options 014 and 081...

Page 25: ...y lower it then release the latch pin item Lower the receiver deck to its fully lowered position and ensure that the latch pin latches in the lowered position 3 With a T 10 TORX driver install the fou...

Page 26: ...ove any adhesive remaining on the front panel 4 Remove the protective backing from the new Option 014 front panel overlay item 5 Starting from either the left or right side loosely place the overlay i...

Page 27: ...le item to the A3 front panel interface board 3 Slide the front panel over the test port connectors being careful to align the power switch and floppy disk drive to their corresponding front panel cut...

Page 28: ...lation Procedure for the Upgrade Kit Figure 15 Front Panel Assembly Reinstallation The previous figure and the figure below show the E8363 4B front panel and floppy disk drive The E8363 4C front panel...

Page 29: ...panel feet item by installing the center screws item 3 Slide the four bottom feet item into position on the cover 4 With a T 20 TORX driver install the strap handles item by installing the screws item...

Page 30: ...click Option Enable 2 In the Select Desired Option list click UNL Bias Tees w Atten 3 Click Enable 4 Click Yes in answer to the displayed question in the Restart Analyzer box 5 When the installation i...

Page 31: ...mance Tests and System Verification The analyzer should now operate and phase lock over its entire frequency range If you experience difficulty with the basic functioning of the analyzer contact Keysi...

Page 32: ...This information is subject to change without notice Keysight Technologies 2003 2016 Edition 1 October 2016 www keysight com...

Reviews: