Assembly
22
Step 8
Slide the Right Pec Dec Arm (22) on to the shaft of the Pec Dec Mount (21). Secure the arm in place using
one Big Washer (102), one Washer (143), one Spring Washer (119), and one Allen Bolt (128).
Slide Pec Dec Handle Bar (24) onto the top of the Right Pec Dec Arm (22) and secure using one Chrome
Washer (101), one Washer (143), one Spring Washer (119), and one Allen Bolt (128).
Repeat this step to complete the Left Pec Dec assembly.
Figure 8
Summary of Contents for Horizontal Pressing Station KPS-2050
Page 5: ...Assembly 5 Box 1 ...
Page 6: ...Assembly 6 Box 2 ...
Page 7: ...Assembly 7 Box 3 ...
Page 8: ...Assembly 8 Box 4 ...
Page 9: ...Assembly 9 Box 5 ...
Page 10: ...Assembly 10 Box 6 ...
Page 11: ...Assembly 11 Box 7 Box 8 Box 10 Box 12 Box 9 Box 11 ...
Page 12: ...Assembly 12 ...
Page 13: ...Assembly 13 ...
Page 14: ...Assembly 14 ...
Page 40: ...Assembly 40 Congratulations You have completed the assembly of your new KPS 2050 ...
Page 43: ...Cable View 43 ...
Page 44: ...Top View 44 ...
Page 45: ...Exploded View 45 ...