12
ENGLISH
INSTALLATION LAYOUT
1
1
4
7
6
6
3
2
8
5
5
5
5
PREPARATORY STEPS
The new series of actuadors AXIL, has been devised to serve gates up to 300 Kg with leaf up to 2,8 meters
wide.
Before proceeding with the installation, please make sure that your gate opens and closes freely, and that:
• Hinges and pins are in optimum condition and properly greased.
• No obstacles are within the moving area.
• There is no friction with the ground or between the leaves.
• Your gate is equipped with a central latch.
INSTALLATION
Open the packaging and check that the gear motor has not been damaged during transport
Install the ledges for the opening and closing
1
actuator
2
Blinker
3
Aerial
4
Key or digital selector
5 Photocells
6 Column
7
Warning board
8
Control unit
Summary of Contents for STAR 300
Page 9: ...NOTE ANMERKUNGEN NOTES NOTA NOTES OBSERVA ES...
Page 17: ...NOTE ANMERKUNGEN NOTES NOTA NOTES OBSERVA ES...
Page 25: ...NOTE ANMERKUNGEN NOTES NOTA NOTES OBSERVA ES...
Page 33: ...NOTE ANMERKUNGEN NOTES NOTA NOTES OBSERVA ES...
Page 41: ...NOTE ANMERKUNGEN NOTES NOTA NOTES OBSERVA ES...
Page 49: ...NOTE ANMERKUNGEN NOTES NOTA NOTES OBSERVA ES...
Page 57: ...NOTE ANMERKUNGEN NOTES NOTA NOTES OBSERVA ES...