![Kessler Engineering TL-922 Revival (tm) Installation Manual Download Page 22](http://html1.mh-extra.com/html/kessler-engineering/tl-922-revival-tm/tl-922-revival-tm_installation-manual_1958034022.webp)
15
•
Solder together the free end of #14 white wire to the other #14
red wire
and insulate
with Heat-Shrink tubing.
•
De-solder and remove the white #14 wire emerging from the upper terminal of the
right fuse holder.
•
Solder either one of the #14
yellow wires
emanating from the Step-Start PCB to the
upper terminal of the right fuse holder.
•
Solder together the free end of #14 white wire to the other
yellow wire
. Insulate with
Heat-Shrink tubing.
•
Route the #22 twisted wire pair and connector from the Step-Start PCB up and into
the amplifier toward the filament transformer.
When finished with this step, the results should appear as shown in Figure 3.10.
Figure 3.10: Step-Start to Fuse Holder Connection
www.KesslerEngineeringLLC.com
Summary of Contents for TL-922 Revival (tm)
Page 13: ...6 Figure 3 1 TL 922 Revival tm Upgrade Kit Contents www KesslerEngineeringLLC com...
Page 18: ...11 Figure 3 4 LED Circuit Board Correctly Installed www KesslerEngineeringLLC com...
Page 30: ...23 Figure 3 19 QSK PCB to QRO Output Connections www KesslerEngineeringLLC com...
Page 34: ...27 Figure 3 23 Electronic Bias PCB Installed www KesslerEngineeringLLC com...
Page 47: ...40 Figure 3 30 Step Start PCB www KesslerEngineeringLLC com...
Page 49: ...42 Figure 3 33 LED Schematic Diagram Figure 3 34 LED PCB www KesslerEngineeringLLC com...
Page 50: ...43 Figure 3 35 Electronic Bias Schematic Diagram www KesslerEngineeringLLC com...
Page 51: ...44 Figure 3 36 Electronic Bias PCB www KesslerEngineeringLLC com...
Page 54: ...47 User Notes www KesslerEngineeringLLC com...
Page 55: ...48 5 1 User Notes Continued www KesslerEngineeringLLC com...
Page 56: ...49 5 2 User Notes Continued www KesslerEngineeringLLC com...
Page 57: ...50 5 3 User Notes Continued www KesslerEngineeringLLC com...