26
4. Inspection and Maintenance
The backwater needs to be checked every six
months at a minimum by a qualified and licen-
sed service technician. During the inspection no
wastewater should pass through the backwater
valve.
The following should take place during this ins-
pection:
①
Any debris or build up should be removed
from the parts of the body (thorough clea-
ning)
②
The condition of gaskets / seals and the
surfaces they come in contact with should
be inspected – if required the gasket / seal
should be replaced (see illustrations 7 to 9)
③
Check for proper movement of the two flaps
as well as the manual closure lever – lubri-
cate if necessary
④
Check to make sure the system is water
tight and in proper operating condition by
performing the function / sealing test (see
Chapter 3)
Illustr. 10
Manual closure lever
closed open (operation)
Direction of Flow