
UOB-BA-e-0913
10
7.2 Unpacking
Ö
Take out of the cardboard box the balance and the weighing terminal.
Ö
Make sure that the balance and the weighing terminal are not damaged during
transport.
7.2.1 Scope of delivery
Serial accessories:
KERN UOB
•
Platform (varnished metal) and display equipment
•
4 x adjustable feet
•
Mains power supply
•
Wall fixture (with fixing screws)
•
Operating
Manual
7.3 Placing
Ö
Place pallet scales on the installation site. To transport the pallet scales: Lift-off by
the handle and move it on the conveyor rollers.
Ö
Avoid any pressure on the load cells.
Ö
Put the cable to the weighing terminal in a manner that it is protected against
damage.