PLT-BA-defsi-0510
80
7.2.1 Setup
Level balance with foot screws until the air bubble of the water balance is in the pre-
scribed circle.
Models d = 10 mg
Models d = 1 mg
7.2.2 Scope of delivery
Serial accessories:
•
Balance
•
Weighing
plate
•
Mains power supply
•
Operating
Manual
•
Glass wind screen
7.3 Mains
connection
Power is supplied via the external mains power supply. The stated voltage value
must be the same as the local voltage.
Only use original KERN mains power supplies. Using other makes requires consent
by KERN.
7.4 Connection of peripheral devices
Before connecting or disconnecting of additional devices (printer, PC) to the data in-
terface, always disconnect the balance from the power supply.
With your balance, only use accessories and peripheral devices by KERN, as they
are ideally tuned to your balance.
7.5 Initial
Commissioning
A warming up time of 15 minutes after switching on stabilizes the measuring values.
The accuracy of the balance depends on the local acceleration of gravity.
Strictly observe hints in chapter Adjustment.