5
How to install the balance
•
Prepare the installation site for the IEX balance in a professional manner.
•
Ensure that the installation site is dry, level and firm.
•
The permissible operating temperate range is from -10°C to +40°C
•
The floor base for the installation of the platform balance must be firm enough
for supporting the maximum weight allowed for the load plus the platform
balance.
•
The IEX balance has a display unit connected to the platform.
•
The display unit is designed for attachment to the table or installation on the
wall with the help of a holder.
•
The balance should be unpacked outside the hazardous zone.
•
Remove all transport locking devices after unpacking:
CAUTION!
•
To prevent electrostatic charge, connect the balance to earth.
•
The contact slots for the wires are marked with the icon „ “.
•
Prior to transport, prepare a PE conductor for electrostatic connection to earth of
the display unit.
•
The PE conductor should end in a loop that is screwed to the display unit with the
help of nuts (M4).
•
To ensure that the loop is fixed permanently and in contact with the display unit,
use a lock washer.
•
The PE conductor should be of yellow and green colour and provide a sectional
surface of 4mm².
Transport Securing
8
Doc.No.IEX-BA-e-1412