background image

EFB-BA-e-0411 

2

 

 

 

 

 

GB 

KERN EFB 

Version 1.1  11/2004 

Operating instructions 
School and plaftorm balances 

 

 

 
Table of contents: 

1

 

TECHNICAL DATA ........................................................................................................................ 3

 

2

 

DECLARATION OF CONFORMTY ............................................................................................... 4

 

3

 

FUNDAMENTAL INFORMATION (GENERAL) ............................................................................ 5

 

3.1

 

I

NTENDED USE

.......................................................................................................................... 5

 

3.2

 

I

NAPPROPRIATE USE

................................................................................................................. 5

 

3.3

 

G

UARANTEE

............................................................................................................................. 5

 

3.4

 

M

ONITORING THE TEST SUBSTANCES

......................................................................................... 5

 

4

 

FUNDAMENTAL SAFETY INFORMATION .................................................................................. 6

 

4.1

 

O

BSERVE THE INFORMATION IN THE OPERATING INSTRUCTIONS

................................................... 6

 

4.2

 

S

TAFF TRAINING

....................................................................................................................... 6

 

5

 

TRANSPORT AND STORAGE...................................................................................................... 6

 

5.1

 

A

CCEPTANCE CHECK

................................................................................................................ 6

 

5.2

 

P

ACKAGING

.............................................................................................................................. 6

 

6

 

UNPACKING, INSTALLATION AND COMMISSIONING ............................................................. 7

 

6.1

 

P

LACE OF INSTALLATION

,

 PLACE OF USE

.................................................................................... 7

 

6.2

 

U

NPACKING

.............................................................................................................................. 7

 

6.2.1

 

Installation.......................................................................................................................... 7

 

6.2.2

 

List of items supplied ......................................................................................................... 7

 

6.3

 

E

NERGY SUPPLY

....................................................................................................................... 8

 

6.4

 

S

WITCHING ON

......................................................................................................................... 8

 

6.5

 

S

WITCH 

–O

FF 

/

 

A

UTO

-O

FF

........................................................................................................ 8

 

7

 

OPERATION................................................................................................................................... 8

 

7.1

 

O

VERVIEW OF THE KEYPAD

....................................................................................................... 8

 

7.2

 

O

PERATING INSTRUCTIONS

....................................................................................................... 9

 

7.2.1

 

Weighing ............................................................................................................................ 9

 

7.2.2

 

Taring................................................................................................................................. 9

 

7.2.3

 

Hold.................................................................................................................................... 9

 

8

 

MAINTENANCE, UPKEEP, DISPOSAL...................................................................................... 10

 

8.1

 

C

LEANING

.............................................................................................................................. 10

 

8.2

 

M

AINTENANCE

,

 UPKEEP

.......................................................................................................... 10

 

8.3

 

D

ISPOSAL

.............................................................................................................................. 10

 

9

 

TROUBLESHOOTING ................................................................................................................. 10

 

 

Summary of Contents for EFB

Page 1: ...elei 1 D 72336 Balingen E Mail info kern sohn com Tel 49 0 7433 9933 0 Fax 49 0 7433 9933 149 Internet www kern sohn com Operating instructions School and plaftorm balances KERN EFB Version 1 1 11 200...

Page 2: ...THE OPERATING INSTRUCTIONS 6 4 2 STAFF TRAINING 6 5 TRANSPORT AND STORAGE 6 5 1 ACCEPTANCE CHECK 6 5 2 PACKAGING 6 6 UNPACKING INSTALLATION AND COMMISSIONING 7 6 1 PLACE OF INSTALLATION PLACE OF USE...

Page 3: ...y max 80 non condensing Case W x D x H mm 300 x 400 x 80 Weighing plate stainless steel mm 300 x 300 Mains adapter solary KERN EFB 200 1D EFB 2000 0D EFB 5K2D Readout 0 1g 0 2g 1g 2g 2g 5g Weighing ra...

Page 4: ...e fol lowing standards Deutsch Wir erkl ren hiermit da das Produkt auf das sich diese Erkl rung bezieht mit den nach stehenden Normen bereinstimmt Fran ais Nous d clarons avec cela responsabilit que l...

Page 5: ...f Structural alterations may not be made to the balance This can lead to incorrect weighing results faults concerning safety regulations as well as to destruction of the balance The balance may only b...

Page 6: ...ed members of staff 5 Transport and storage 5 1 Acceptance check Please check the packaging immediately upon delivery and the device during un packing for any visible signs of external damage 5 2 Pack...

Page 7: ...ess for longer periods of time In admissible bedewing condensation of air moisture on the device can occur if a cold device is taken into a significantly warmer environment In this case please acclima...

Page 8: ...ls will appear You can check whether all segments are clearly shown on the display Zero indicates that the scales are ready for operation 6 5 Switch Off Auto Off Press the key until 0 is indicated in...

Page 9: ...weight of the cup is now memorised Fill weighing object in the container read measuring value By pressing key after the terminated weighing operation 0 appears again in the display The taring procedu...

Page 10: ...ing location 9 Troubleshooting The balance should be switched off for a short time following an interruption in the programme sequence It is then necessary to repeat the weighing process from the begi...

Page 11: ...EFB BA e 0411 11...

Reviews: