p6  

aylesbury kb valve

alignMent Warning!

tHe actuator arM Must Be fItteD wItH tHe 

Brass enD tIlteD Down wHen In tHe closeD 

PosItIon anD ensure tHe BuBBle In tHe sPIrIt 

level Is Between tHe lInes. tHIs Is crItIcal to 

tHe oPeratIon of tHe valve.

18

   

Adjust the length of the chain from  
the buoy to the hanger to match the 
following: 

 

 

chain length = y - 190mm  
(20,25,32 & 40sF)

 

 chain length = y - 250mm  
(40HF & 50HF)

 

 

Do not cut the chain, loop  
any excess chain on to the hanger.

19

   

Unhook the Float Adjusting Peg and 
move the float along the chain so the  
distance from the Hanger to the Float 
Peg is as follows: 

x - 163mm

20

 

  The highest closing water level (JMIN 

page 7) can be achieved by having no 
spare chain links between the hanger 
and the float adjusting peg. The lowest 
closing water level (JMAX page 7) can be 
achieved by having the float touching the 
top of the opening buoy whilst using all of 
the available chain (last link on hanger).

21

 

  Applications where the top water level 

(TWL) can rise after the valve has closed 
will cause the chain to become slack.  
A cable tie/ratchet strap should be fitted 
over the float adjusting peg in such a 
way as to prevent the chain from slipping 
off. Ensure the chain cannot become 
entangled with tank tie bars etc.

it May be easier to adjust tHe cHain lengtH  
beFore installation. 

22

  

 delayed action (level diFFerential) 

The delayed action is the distance the 
water level will drop from before the 
valve opens i.e. the difference between 
opening and closing water levels. This is 
adjustable between PMIN (Float touching 
top of Opening Buoy) and PMAX (Float 
Adjusting Peg almost touching Hanger 
whilst using all of the available chain)  
see page 7.

testing

Before leaving the installation, manually 
move the valves to test their operation a 
number of times, ensuring that they move 
freely from the open to the closed position 
and from the closed to the open position.

Where a valve has not been in operation for 
one month it is also recommended that the 
above procedure is carried out.

diagraM 6

sPirit  

level

Summary of Contents for AYLESBURY KB

Page 1: ...T Please keep for future reference PLEASE READ THESE INSTRUCTIONS CAREFULLY AND REFER TO ANY DIAGRAMS BEFORE INSTALLATION These instructions contain important information which will help you install y...

Page 2: ...as been installed and tested complete and apply the tank label to the tank and send a photograph of the label in place to warranties keraflo co uk in order to receive a full five years extended warran...

Page 3: ...the valves allows sufficient clearance between the float and most internal tank flanges and ribs dimension G shown on drawing on page 7 The valve backnuts may be adjusted to enable fitting to tanks w...

Page 4: ...and retain one backnut 5 Insert the valve tail through the hole in the tank wall replace the backnut with the flanged side against the tank wall 6 Connect the supply pipe then hand tighten the backnut...

Page 5: ...OF THE VALVE 15 The length of this chain determines the opening water level and the position of the float on the chain determines the closing level and the delay 16 CLOSING WATER LEVEL TWL When the ac...

Page 6: ...all of the available chain last link on hanger 21 Applications where the top water level TWL can rise after the valve has closed will cause the chain to become slack A cable tie ratchet strap should...

Page 7: ...vel achieved before the valve closes 20 1 25 1 32 1 40 SF 1 40 HF 2 50 SF SIZES DN AYLESBURY Kb Valve p7 DN 20 25 32 40sF 40HF 50SF SIZE 1 1 1 sF 1 HF 2 SF jmin 175 175 175 175 210 210 jmax 1800 1800...

Page 8: ...0SF SIZE 1 1 1 sF 1 HF 2 SF a 330 330 277 277 277 315 bmax 44 44 55 55 55 92 c 34 34 73 73 73 73 d 19 5 26 9 35 4 35 4 35 4 35 4 e 26 5 33 42 47 5 47 5 6o f 142 142 142 142 186 186 gmin 92 92 74 74 54...