![KEP BATCHtrol II Installing & Operating Manual Download Page 10](http://html1.mh-extra.com/html/kep/batchtrol-ii/batchtrol-ii_installing-and-operating-manual_1956282010.webp)
6
Full Size Panel Cutout Template
(copy before using)
SECTION 2 INSTALLATION
2-1 Receipt of Equipment
2-1 Receipt of Equipment
When the equipment is received, the outside
packing case should be checked for damage
incurred during shipment. If the packing case
is damaged, the local carrier should be notifi ed
at once regarding his liability. A report should
be submitted to the factory.
Carefully remove the equipment from the pack-
ing case and inspect for damaged or missing
parts.
2-2 Return Shipment
2-2 Return Shipment
Do not return assembly or part with out a Return
Material Authorization. The RMA is obtained by
calling your local distributor.
2-3 Panel Mounting
2-3 Panel Mounting
The controller should be located in an area with
a clean, dry atmosphere which is relatively free
of shock and vibration. The Batcher is installed
in a 7.365” (187 mm) wide by 2.495” (63.4 mm)
high panel cutout. To mount the controller pro-
ceed as follows:
a. Prepare the panel opening.
b. Slip the gasket (provided) over the rear of
the counter case and slide it forward until it
engages the inner surface of the front be-
zel.
c. Install the screws (provided) in the mounting
brackets and insert in the holes located on
both sides of the Batcher.
d. Tighten the screws fi rmly to attach the coun-
ter bezel to the panel.
2-4 Electrical Connections (Reference Figures
2-1 to 2-3)
All connections are completed at terminal blocks
located at the rear of the case. Make sure all
power is disconnected before making any elec-
trical connections. In cases where cables are
situated in areas with heavy electrical fi elds,
1-5 Dimensions (continued)