RECOVERY WATER SYSTEM
ENGLISH
SERVICE MANUAL
26
9097065000(2)2009-06
Razor™ 20 / 20T
SQUEEGEE SPRING CHECK/REPLACEMENT (All models, with aluminium squeegee)
Check
Drive the machine on a level loor.
1.
• (For Razor™ 20T) Turn the ignition key (80) to “0”.
2.
(For Razor™ 20) Turn off the switches (71) and (73).
•
Check that the springs (A) and (B) push the squeegee (C) on the loor correctly.
3.
If necessary, disassemble and replace the springs according to the following procedure.
4.
Disassembly
Remove the squeegee (see the procedure in the relevant paragraph).
5.
Lift the deck by pressing the pedal (11).
6.
Grasp the handlebar (2) and lower the front part of the machine.
7.
Remove the cotter pin (D).
8.
Disengage the end (E) of the left spring (F) from the housing (G).
9.
Remove the left spring (F).
10.
Repeat steps 8, 9 and 10 for the right spring (H).
11.
Assembly
Assemble the springs by performing steps 5 to 11 in the reverse order.
12.
A
B
C
D
E
G
H
F
S301557
Summary of Contents for Razor 20
Page 49: ......