9
W
arr
ant
y
Safet
y
Oper
ation
Cle
aning
Installation
Ser
vic
e P
ar
ts
6” ROUND
METAL
DUCT
DUCT TAPE
DECORATIVE
FLUE
FASTEN FLUE TO
UPPER BRACKET
WITH MOUNTING
SCREWS
(3,9x9,5mm)
CONNECT DUCTWORK (ducted configuration only)
1. Adjust the width of the
flue mounting bracket
assembly
to equal the inside width of decorative
flue. Insert and tighten
mounting screws (3,9 X 6
mm)
to hold bracket width.
2. Use
mounting screws (4,8 x 38 mm)
and
wall
anchors
to secure flue mounting bracket to the
ceiling as shown.
FLUE
MOUNTING
BRACKET
ASSEMBLY
MOUNTING
SCREWS
(3,9x6mm)
MOUNTING
SCREWS
(4,8x38mm)
3. Use 6” round damper / duct connector to 6”
discharge on hood.
4. Attach
6” round metal duct
to connect the duct
collar on the hood to the ductwork above.
5. Use
duct tape
to make all joints secure and air
tight.
6. Insert the
decorative flues
setting them on the
hood.
7. Extend the
upper flue
to the ceiling and secure
with two
mounting screws (3,9 x 9,5 mm)
.
WALL
ANCHORS
UPPER
FLUE
LOWER
FLUE
LOUVERS
ON UPPER
FLUE (Slide
down, inside
of lower
flue)