Copyright © 2002 - 2014 KEMP Technologies, Inc. All Rights Reserved. Page 16 / 37
High Availability (HA)
Feature Description
Figure 5-15: Confirmation message
5.
A confirmation message may appear. Click
OK
.
Figure 5-16: Rebooting screen
6.
Click
Continue
.
When HA1 is back online, both HA status icons should be green. The
A
should have moved into
the right green square.
This means that the secondary unit is now the active unit.