Page
5
(
Rev
.
A
-
6
/
2012
)
26
27
28
29
30
31
32
33
34
35
16
9
25
13
8
24
15
13
36
PUSH
SLOTTED
SCREWDRIVER
DECREASE
FLOW
INCREASE
FLOW
Service Instructions
Lower and Upper Shroud
To access the refrigeration system and plumbing connections, remove four screws from bottom of
cooler to remove the lower shroud. To remove the upper shroud for access to the pushbars,
regulator, solenoid valve or other components located in the top of the unit, remove lower shroud,
disconnect drain, remove four screws from tabs along lower edge of upper shroud, unplug two wires
and water tube. SEE FIG.4, FIG.5 & FIG.6.
Bubbler
To remove the bubbler, first disconnect the power supply. The underside of the bubbler can be
reached through the access panel (Item 8) on the underside of the upper shroud (Item 14). Remove
the access panel by removing the retaining screw (item 24) . To remove the bubbler, loosen locknut
(Item 29) from the underside of the bubbler and remove the tubing from the quick connect fitting.
After servicing, replace the access panel and self-tapping screw. SEE FIG.7.
FIGURE 6
FIGURE 7