Kelvinator Air Conditioning
Installation instructions 7
Installation of indoor and outdoor electric wires
1 Open the front panel.
2 Remove the wiring cover connect and fix power
connection cord to the terminal board. (As shown below.)
3 Make the power connection cord pass through the hole
at the back of indoor unit.
4 Reinstall the cord anchorage and wiring cover.
5 Reinstall the front panel.
For 2.6kW and 3.5kW units:
yellow-
brown
black
blue
2
N(1)
3
Wiring Cover
outdoor unit connection
green
For 5.3kW, 6.2kW, 7.0kW and 8kW units:
yellow-
brown
black
blue
2
N(1)
3
Wiring Cover
outdoor unit connection
green
Note:
All wires between indoor and outdoor units must be
connected by a qualified electric contractor.
• Electric wires must be connected correctly. Improper
connection may cause malfunction.
• Tighten the terminal screws .
• After tightening the screws, pull the wire slightly to
confirm whether it's firm or not.
• Make sure that the electric connections are earthed
properly to prevent electric shock.
• Make sure that all wiring connections are secure and the
cover plates are reinstalled properly. Poor installation
may cause fire or electric shock.
Installation of indoor unit
• The piping can be output from right, right rear, left or
left rear.
1 When routing the piping and wiring from the left or right
side of indoor unit, cut off the tailings from the chassis
when necessary. (As shown in Fig.1)
a. Cut off the tailings 1 when routing the wiring only;
b. Cut off the tailings 1 and tailings 2 when routing both
the wiring and piping.
2 Take out the piping from body case, wrap the piping,
power cords, drain hose with the tape and then make
them pass through the piping hole. (As shown in Fig.2)
3 Hang the mounting slots of the indoor unit on the
upper hooks of the mounting plate and check if it is
firm enough. (As shown in Fig.3)
4 The installation site should be 2m or more above
the floor.
Right
Right rear
Fig.2
Left rear
Left
Fig.1
Tailing 1
Tailing 2
Finally wrap it
with tape
Gas side piping
insulation
Water drainage pipe
Liquid side
Piping insulation
Gas side pipe
External connection
electric wire
Liquid side piping
Fig.3
Mounting
plate
Fixing hook
Mounting
plate
Installation of connection pipe
Align the centre of the piping flare with the related valve.
Screw in the flare nut by hand and then tighten the nut with
spanner and torque wrench by referring to the following:
Hex nut diameter
Tightening torque (N·m)
6
15~20
9.52
30~40
12
45~55
16
60~65
19
70~75
For installations with connecting pipes greater than 5m,
additional refrigerant is required at the following rates per
extra metre of pipe.
2.6 kW & 3.5 kW Reverse cycle 20g/m
2.6 kW & 3.5kW Cooling only 15g/m
5.3 kW & 6.2 kW Reverse cycle 50g/m
7.0 kW Cooling only, 7.0 kW & 8.0 kW Reverse cycle 50g/m