Installation of indoor and outdoor electric wires

1.  Open the front panel.
2.   Remove the wiring cover connect and fix the power connection 

cord to the terminal board as shown in below.

3.   Pass the power connection cord through the hole at the back 

of the indoor unit.

4.  Reinstall the cord anchorage and wiring cover.
5.  Reinstall the front panel.

yellow-

brown

black

blue

2

N(1)

3

Wiring Cover

outdoor unit

Indoor unit terminal block

green

NOTE: All wires between indoor and outdoor units must be 
connected by a qualified electric contractor.

• 

 Electric wires must be connected correctly. Improper 
connection may cause malfunction.

• 

 Tighten the terminal screws firmly.

• 

 After tightening the screws, pull the wire slightly to confirm it's 
securely attached.

• 

 Make sure that the electric connections are earthed properly to 
prevent electric shock.

• 

 Make sure that all wiring connections are secure and the cover 
plates are reinstalled properly. Poor installation may cause fire 
or electric shock.

Installation of Indoor Unit

• 

 The piping can be output from right, right rear, left or 
left rear.

1.   When routing the piping and wiring from the left or right 

side of indoor unit, cut off the tailings from the chassis when 
necessary (As shown in Fig.1)

 

a. Cut off the tailings 1 when routing the wiring only; 

 

b.  Cut off the tailings 1 and tailings 2 when routing both the 

wiring and piping.

2.   Take out the piping from body case, wrap the piping, power 

cords, drain hose with the tape and then make them pass 
through the piping hole. (As shown in Fig.2)

3.   Hang the mounting slots of the indoor unit on the 

upper hooks of the mounting plate and check if it is 
firm enough. (As shown in Fig.3)

4.   The installation site should be 2m or more above 

the floor.

Right

Right rear

Fig.2

Left rear

Left

Fig.1

Tailing 1

Tailing 2

Finally wrap it

with tape

Gas side piping

insulation

Water drainage pipe

Liquid side

Piping insulation

Gas side pipe

External connection

electric wire
Liquid side piping

Fig.3

Mounting

plate

Fixing hook

Mounting

plate

Installation of Connection Pipe

Align the center of the piping flare with the related valve. Screw in 
the flare nut by hand and then tighten the nut with spanner and 
torque wrench by referring to the following:

Outer diameter (mm)

Torque (N.m)

6.35 (1/4”)

15-20

9.52 (3/8”)

35-40

12.70 (1/2”)

50-55

15.88 (5/8”)

60-65

19.05 (3/4”)

70-75

For installations with connecting pipes greater than 5m, additional 
refrigerant is required at the following rates per extra metre of pipe.

2.5 kW & 3.5 kW & 5.2kW 16g/m  
7.0 kW & 8.0 kW 40g/m

Summary of Contents for KSV25HRD

Page 1: ...Inverter Split Room Air Conditioner Installation Manual KSV25HRD KSV35HRD KSV52HRD KSV70HRD KSV80HRD Refrigerant R410A ...

Page 2: ...your local Electrolux Customer Care Centre ENVIRONMENTAL TIPS environment Information on disposal for users Most of the packing materials are recyclable Please dispose of those materials through your local recycling depot or by placing them in appropriate collection containers If you wish to discard this air conditioner please contact your local authorities and ask for the correct method of dispos...

Page 3: ...responsible for their safety 7 Children should be supervised to ensure that they do not play with the appliance WARNING warning Before obtaining access to terminals all supply circuits must be disconnected Please read this installation manual and the user manual before installation and carefully store in a handy place for later reference Inside you will find many helpful hints on how to install an...

Page 4: ...ent welders or medical equipment salt laden air prevails such as close to coastal areas the air is contaminated with industrial vapours and oils the air contains sulphurous gas such as in hot spring zones corrosive or poor air quality exists Installation Site of Indoor Unit 1 The air inlet and outlet should be away from the obstructions Ensure the air can be blown through the whole room 2 Select a...

Page 5: ... adhered to the air conditioner will not perform to specification may not be able to be serviced and the warranty may be voided The installation must allow for reasonable access by a service technician space necessary for proper installation of the unit with respect to existing building structure Space to the wall 150cm horizontally in front Space to the obstruction Air outlet side e v o b 50cm A ...

Page 6: ...he outlet in the water Installation of indoor unit Installation of Mounting Plate 1 The mounting plate should be installed horizontally As the water tray s outlet for the indoor unit is two way type during installation the indoor unit should slightly slant to water tray s outlet for smooth drainage of condenser water 2 Fix the mounting plate on the wall with screws 3 Be sure that the mounting plat...

Page 7: ... of indoor unit cut off the tailings from the chassis when necessary As shown in Fig 1 a Cut off the tailings 1 when routing the wiring only b Cut off the tailings 1 and tailings 2 when routing both the wiring and piping 2 Take out the piping from body case wrap the piping power cords drain hose with the tape and then make them pass through the piping hole As shown in Fig 2 3 Hang the mounting slo...

Page 8: ...move flare nuts attached to indoor and outdoor unit then put them on pipe tube having completed burr removal Note It is not possible to put them on after flaring work Flare nut Copper tube D Flaring work Carry out flaring work using flaring tool as shown below Firmly hold copper pipe in a die according to the dimension shown in the table below Refrigerant pipe connection Outer diam mm A mm Max Min...

Page 9: ...kage Test 1 Connect charging hose of manifold valve to charge end of low pressure valve both high low pressure valves must be tightly shut 2 Connect joint of charging hose to vacuum pump 3 Fully open the handle of Lo manifold valve 4 Open the vacuum pump for vacuumisation At the beginning slightly loosen joint nut of low pressure valve to check if there is air coming inside If noise of vacuum pump...

Page 10: ...t accurate Operation Test 1 Before Operation Test a Do not switch on power before installation is finished completely b Electric wiring must be connected correctly and securely c Cut off valves of the connection pipes should be opened d All the impurities such as scraps and waste must be cleared from the unit 2 Operation Test Method a Switch on power and press ON OFF button on the remote controlle...

Page 11: ...hown in the fig For 5 2kW is as below Clasp of RJ45 plug of network cable shall aim at the notch of RJ45 terminal to be installed The clasp shall be towards inside as shown in the fig For 7 0kW and 8 0kW is as below Clasp of RJ45 plug of network cable shall aim at the notch of RJ45 terminal to be installed The clasp shall be towards left as shown in the fig Bundle the Dred network cable at the wir...

Page 12: ...12 Notes Notes ...

Page 13: ...13 Notes Notes ...

Page 14: ...14 Notes Notes ...

Page 15: ...ct claimed is due to faulty or defective parts or workmanship Electrolux is not liable in the following situations which are not exhaustive a the Appliance is damaged by i accident ii misuse or abuse including failure to properly maintain or service iii normal wear and tear iv power surges electrical storm damage or incorrect power supply v incomplete or improper installation vi incorrect improper...

Page 16: ...nator com au NEW ZEALAND phone 0800 436 245 fax 0800 225 088 email customercare electrolux co nz web kelvinator co nz For more information on all Kelvinator appliances or for dimension and installation information call into your retailer phone or email our customer care team or visit our website Kelvinator We are part of the Electrolux family Share more of our thinking at electrolux com au ...