13
3.) Assemble the swing frame, triangle bracket and tine frame.
4.) Assemble the roller and the roller holder, lubricate the bearing with grease.
2st -Bult M12x70 to
the triangular bracket
3st - Bultar M12x100
Pin (110 mm) + washer
(D60mm) and large R sprint
2p pins + 2 M8x20 bolt
with nut and washers
Summary of Contents for 28-RBH220
Page 10: ...10 Table of contents H I J K L M N P Q O ...
Page 18: ...18 Table of contents ...