background image

The  F30  pump  controllers  require  both  electrical  and  mechanical 
fitting. Installation or servicing of these controllers should only be 
carried out by competent qualified personnel familiar with hydraulics, 
pump fitting and with electrical control circuitry.

GENERAL NOTES

The F30 pump controllers are normally used to give dry run protection to 
pressure pump systems. By using the system’s existing pressure switch, 
a normal pressure start pressure stop pump can be converted to either 
a  pressure  start  flow  stop  or  a  flow  start  flow  stop  system.  This  gives 
some major benefits in the way the pump performs in comparison to a 
conventional pressure start pressure stop pump system. In addition to dry 
run protection, such a system will supply a relatively constant pressure, 
free from the cyclic pressure fluctuations that are characteristic of normal 
pressure systems. No pressure cycling means a small draw off air cell 
can be used, even on a large pump. Before installing the F30, a basic 
decision needs to be made as to how you want the pump to operate. The 
F30 can be mounted before or after the air cell to achieve totally different 
operating characteristics.

INSTALLING THE F30 BEFORE THE AIR CELL

If  the  F30  is  installed  between  the  pump  and  the  air  cell  and  a  tap  is 
opened, the air cell will supply the demand, large or small. The pressure 
will  drop  and  eventually  the  pressure  switch  will  close,  starting  the 
pump and supplying the demand. In other words there will be a delay 
between turning on a tap and the pump starting. This delay will depend 
on the draw off capacity of the air cell and the demand flow rate. This 
configuration has the advantage that the pump will not start every time 
a tap is turned on, but only if there is a genuine sustained demand for 
water. This configuration is what is meant by “pressure start flow stop”. 
This configuration is ideal for large pumps where there may be small or 
frequent demands, such as in communal wash rooms. A large draw off 
air cell is often used in such systems to further reduce the pump’s start 
stop frequency.

INSTALLING THE F30 AFTER THE AIR CELL

If a tap is opened too much more than a trickle with this configuration, 
the  pump  will  immediately  start,  due  to  the  paddle  of  the  F30  being 
pushed forward by the flow from the air cell. This is what is described 
as  “flow  start”.  With  this  arrangement  the  only  time  the  system  will 
start on pressure drop is if there are leaks in the piping or a tap is left 
trickling.  In such a situation, the pump will automatically start when the 
pressure  switch  eventually  closes,  re-pressurise  the  system  and  stop 
after a time delay, under the control of the F30. The main advantage of 
installing the F30 after the air cell is that the system will give an instant full 
pressure start at a very constant flow every time a tap is turned on. This 
configuration is ideal for small irrigation systems, gardens and household 
use. Where a gravity fed hot water system is installed, the hot and cold 
cycling  in  showers  that  plague  normal  pressure  pumps  are  eliminated 
with this configuration.

INSTALLATION

Having decided which basic configuration to use, follow the notes below.  
Set out are some circuit examples and some essential details on installing 
and adjusting the F30.  
A suitable location should be selected for the controller in either the suction 
or delivery pipework of the pump. The controller should be installed in a 
location that is away from both vibration and heat, preferably out of direct 
exposure to the weather and above any flood level. A 1” BSP or larger 
socket must be provided in the pipework to fit the controller. The socket 
should be located on the topside of a horizontal section of the pipe with 
at least 5 diameters of straight pipe either side of the controller. Under 
no circumstances mount the controller upside down under the pipe, or 
close  to  valves,  tees,  bends  or  any  other  object  likely  to  cause  major 
turbulence in the flow.

CHECK VALVE

ISOLATION VALVE

SUCTION PIPE

PUMP

SERVICE

PRESSURE

SWITCH 

BLEED VALVE

AIR CELL

ISOLATION

VALVE

F30HD

FLOW

TYPICAL LARGE INDUSTRIAL OR RURAL PUMP INSTALLATION

In most installations the paddle of the controller will need to be trimmed 
to suit the specific pipe in which the unit is to be installed. The paddle of 
the controller needs a force of around 15 to 20 grams acting on it from 
the flow in order to operate correctly. High velocity flow can generate high 
forces and damage or break the paddle. As a general guide the paddle 
of the controller should extend to around the centre line of the pipe, or 
a bit past the centre. The paddle would not normally be left longer than 
this unless the expected flow velocity was very low. Cut the paddle so 
it extends to about the centre line of the pipe, or a little past the centre 
when screwed into its socket. Ensure the paddle will clear the sides of 
the socket and has enough room to swing back and forward freely. Apply 
Teflon tape or a suitable thread sealant and screw the controller into the 
socket  using  the  spanner  flats  provided.  Do  not  twist  the  body  of  the 
controller  or  use  it  to  screw  the  unit  into  the  socket,  as  to  do  so  may 
damage the housing. When properly installed there should be a gap of 
at least 4mm between the top of the 1”BSP thread and the under edge 
of  the  spanner  hexagon.  Under  no  circumstances  should  the  thread  
be allowed to bottom out in its socket as to do so places the thread in 
tension and may result in the controller housing cracking under pressure.  
A quick release fitting can be used between the F30 and the pipe tee, 
as shown in the accompanying drawing. This makes maintenance and 
removal very simple.

FLOW

PREFERED LAYOUT, WITH PIPE WORK HORIZONTAL AND LEVEL

4mm MINIMUM

SEE NOTES
PADDLE CUT TO HALF WAY
ACROSS PIPE

F30 MOUNTED IN A PIPE TEE

FLOW

PADDLE CUT TO HALF WAY

ACROSS PIPE

4mm MINIMUM

ANKA QUICK COUPLING

QLCM40 & QLCF40

40 BY 25 REDUCING BUSH

CONTROLLER MOUNTED IN THE MIDDLE OF 10 DIAMETERS OF STRAIGHT PIPE

F30 MOUNTED IN A QUICK RELEASE COUPLING

SUCTION

DISCHARGE

PRESSURE

SWITCH
PUMP

AIR CELL

F30HD

F30HD MOUNTED BEFORE THE AIR CELL

  F30 INSTALLED BEFORE

 

THE AIR CELL

SUCTION

DISCHARGE

PRESSURE

SWITCH

PUMP

AIR CELL

F30HD

F30HD MOUNTED AFTER THE AIR CELL

 

F30 INSTALLED AFTER

 

THE AIR CELL

INSTALLATION AND OPERATING OF F30 PUMP CONTROLLERS

Reviews: