3 Installation
MR33 Series (75K-600K) Modular UPS
User Manual
38
All rights reserved ©Kehua Hengsheng Co., Ltd.
Step 2
Drill 4 holes (hole diameter is
φ
13) by hammer drill according to the bottom installation hole size (as
shown in Figure3-10, Figure3-11).
If the UPS is installed on U-steel, drill 4 hole (hole diameter is
φ
14) on the U-steel directly, and then
perform Step 4 directly.
Figure3-10
Bottom size of MR3375,MR33125, MR33200, MR33300 (unit: mm)
Figure3-11
Bottom size of MR33400, MR33500, MR33600 (unit: mm)
Step 3
Install expansion bolts. The structure and installation for the expansion bolt is as shown in