![background image](http://html1.mh-extra.com/html/keb/c6-p34-box-series/c6-p34-box-series_instructions-for-use-manual_3832912028.webp)
28
INSTaLLaTION aND CONNECTION
3 Installation and connection
3.1 Preparation for installation
3.1.1 Select the mounting location
• Avoid direct sunlight ex-posure.
• Make sure that C6 P34 Box is properly (ergonomically) accessible to the operator.
• Choose a suitable mounting height.
• Ensure that the aeration holes are not covered.
3.2 Checking the package contents
• Check the package content for visible signs of transport damage and for complete-
ness.
• In the case of damaged parts, contact your KEB representative. Do not install parts
that were damaged during the shipment.
3.3 Checking the operating conditions
•
Read carefully the standards, approvals, EMC parameters and technical specifi
-
cations for operation of the device. This information is available in the following
sections:
a) Certificates and approvals.
b) Electromagnetic compatibility .
• Check the mechanical and climatic ambient conditions for operation of the device.
• Follow the instructions for local use of the device.
• Adhere to the permissible rated voltage and the associated tolerance range.
3.4 Mounting position
C6 P34 Box device is suitable for installation in:
•
Mountain cabinets
•
Control cabinets
•
Switchboards
•
Consoles