5
SERIES 2000 BB MODELS
OPERATING INSTRUCTIONS
BB CONTROL PANEL – SERIES 2000
START-UP PROCEDURE
WARNING: DO NOT START FRYER WITHOUT
FIRST FILLING FRY POT.
STEP 1. Set "MELT-IDLE-FRY" switch to "IDLE"
position and thermostat to the "OFF"
position.
STEP 2. Turn "MAIN POWER" switch to the "ON"
position.
STEP 3. Light constant pilot located on left side of
pilot runner tube.
STEP 4. Hold the "PUSH TO LIGHT" switch in until
the amber "PILOT ON" light comes on.
STEP 5. Set thermostat to desired temperature.
STEP 6. Set "MELT-IDLE-FRY" switch to "FRY." The
burners will come on. Select "MELT" with
solid shortening until liquid shortening is 1"
from full, then switch to the "FRY" position
after packing shortening around burner
tubes.
SHUTDOWN PROCEDURE
STEP 1. Set "MELT-IDLE-FRY" switch to "IDLE"
position and thermostat to the "OFF"
position.
STEP 2. Turn "MAIN POWER" switch to the "OFF"
position. Its green light will go off.
STEP 3. Turn gas supply valve to the "OFF" position.
STEP 4. Check to make sure all burners and pilot are
extinguished.
SERIES 2006 BB MODELS
OPERATING INSTRUCTIONS
BB CONTROL PANEL – SERIES 2006
START-UP PROCEDURE
WARNING: DO NOT START FRYER WITHOUT
FIRST FILLING FRY POT.
STEP 1. Set thermostat to the "OFF" position.
STEP 2. Turn "MAIN POWER" switch to the "ON"
position. The power ON light will illuminate.
STEP 3. Hold the "PUSH TO LIGHT" switch over
until the amber "PILOT ON" light comes on.
Release switch.
STEP 4. Set thermostat to desired temperature.
STEP 5. Set "MELT-FRY" switch to "FRY." The
burners will come on. Select "MELT" with
solid shortening until liquid shortening is 1"
from full, then switch to the "FRY" position
after packing shortening around burner
tubes.
SHUTDOWN PROCEDURE
STEP 1. Set thermostat to the "OFF" position.
STEP 2. Turn "MAIN POWER" switch to the "OFF"
position.
STEP 3. Turn gas supply valve to the "OFF" position.
STEP 4. Check to make sure all burners and pilot are
extinguished.
SERIES 2006 BB SPARK IGNITION
OPERATING INSTRUCTIONS
BB SPARK IGNITION CONTROL PANEL – SERIES 2006
START-UP PROCEDURE
WARNING: DO NOT START FRYER WITHOUT
FIRST FILLING FRY POT
STEP 1. Set thermostat to the "OFF" position.
STEP 2. Turn "MAIN POWER" switch to the "ON"
position.
STEP 3. Set thermostat to desired temperature.
STEP 4. Set "MELT-FRY" switch to "FRY." The
burners will come on. Select "MELT" with
solid shortening until liquid shortening is 1"
from full, then switch to the "FRY" position
after packing shortening around burner
tubes.
SHUTDOWN PROCEDURE
STEP 1. Set thermostat to the "OFF" position.
STEP 2. Turn "MAIN POWER" switch to the "OFF"
position.
STEP 3. Turn gas supply valve to the "OFF" position.
STEP 4. Check to make sure all burners and pilot are
extinguished.
Summary of Contents for GAS FRYER
Page 20: ...18 SERIES 2000 2005 RUNNER PILOT ASSEMBLY Spark Ignition Models See page 27...
Page 34: ...32 BB 2000 ELECTRICAL ASSEMBLY AA 2010 ELECTRICAL ASSEMBLY FRONT DRAIN...
Page 39: ...37 TS 2007 ELECTRICAL ASSEMBLY FRONT DRAIN TS 2000 ELECTRICAL ASSEMBLY WITH SAFE EASY FILTER...
Page 46: ...44 CPU 2007 ELECTRICAL ASSEMBLY WITH SAFE EASY FILTER CPU 2007 ELECTRICAL ASSEMBLY FRONT DRAIN...
Page 49: ...47 BASKET LIFT ELECTRICAL ASSEMBLY WITH CPU MODELS SERIES 2007...
Page 50: ......
Page 51: ......