Commissioning:
The lifting unit is fully installed and all transport locks, e.g. at the sensor, have been
removed.
NOTE
The control unit parameters have been set at the factory. The parameters need not
be changed for commissioning.
6.3.1
Lifting unit with LevelControl Basic 1
DANGER
Control unit cover not closed properly
Danger to life!
▷
After making the tank settings, make sure to close the control unit cover
properly.
▷
Then plug in the mains plug again.
Steps required for commissioning:
1.
Set the parameter for the inlet nozzle to be used (recommended).
2.
Connect the rechargeable battery.
3.
Check the direction of rotation.
4.
Test the lifting unit for correct function and leak-free operation.
Setting the unit to the lowest inlet nozzle used
The switching frequency can be reduced by setting the unit to the lowest inlet nozzle
used. A switch for this setting is provided on the printed circuit board, which can be
accessed after the control unit cover has been opened.
Settings see table below.
Table 10: Possible tank settings
Tank
Level of lowest open inlet nozzle
DIL switch settings
[mm]
DIL 1
DIL 2
DIL 3
DIL 4
U1.60 E
U1.60 D
Horizontal, 100 mm (DN 50)
Off
Off
Off
Off
Horizontal, 180 mm
Off
Off
Off
Off
Vertical
On
Off
Off
Off
U1.100 E
U1.100 D
U2.100 E
U2.100 D
Horizontal, 180 mm
Off
On
Off
Off
Horizontal, 250 mm
On
On
Off
Off
Vertical
Off
Off
On
Off
US1.100 D
US2.100 D
Horizontal, 180 mm
On
Off
On
Off
Horizontal, 250 mm
Off
On
On
Off
Vertical
On
On
On
Off
Off
On
6 Commissioning/Start-up/Shutdown
28 of 86