KBR multimess F144-2-LED-ESMS...-4
Current transformer connection:
Energy fl ow direction:
When installing the transformers, observe the current fl ow / energy fl ow direc-
tion. If the current transformer is installed the wrong way, the measured value
will be negative.
The prerequisite for this is that energy be consumed.
Assigning the measuring voltage input / current transformer input:
The current transformer on terminal 20/21 (k1/l1) must be installed in the phase
in which the measuring voltage for terminal 10 (L1) is measured. The same ap-
plies to the other transformer and measuring voltage connections.
With the multimess F144-2-LED-ESMS-...-4, you can check the phase sequence
as follows:
- Switch to the main menu "I"
- Connect the current transformer to the corresponding wires
- If connection and energy fl ow direction are correct, the device will only
display positive currents.
- If connections are wrong, all currents displayed will be negative. Interchange
the connections until the display shows correct values.
CAUTION
Before any interchanging, the current transformers must be shorted out!