Before connecting the device to the power supply, check whether the local power supply 
conditions comply with the specifications on the device nameplate.

 

  CAUTION

A faulty connection can lead to the destruction of the device! 

For device connection, the data given in the connection chart must be complied with 
(see „Connection chart“) and there must be no voltage in the connection lines. When 
wiring, always ensure that all wiring material used is neither damaged nor defective and 
that the polarity is correct!

In order to ensure proper and safe product operation, it must be transported, stored, ins-
talled and assembled in accordance with the specifications, as well as carefully operated 
and maintained.

A visibly damaged device must generally be considered unfit for use and disconnected 
from the power supply!

Error detection, repair and maintenance work may only be carried out in our facilities or 
after contacting our service team. Opening the device unauthorized shall render your 
warranty null and void. Correct operation can no longer be guaranteed!

Opening the device may expose live parts. Capacitors in the device may still be under 
load, even if the device has been disconnected from all voltage sources. Open devices 
must not be operated!

Systems that are at risk from lightning strikes must feature lightning protection for all 
input and output lines!

1.4 

Product liability

You have purchased a high-quality product. Only components of the highest quality and 
maximum reliability are used.

Each device is subject to long-term testing before it is delivered.

For details on product liability, please refer to our general terms and conditions for elect-
ronic equipment, which you can find at www.kbr.de.

Warranty device properties apply only if the device has been operated  in accordance 
with its intended use!

Summary of Contents for multicomp D6 Series

Page 1: ...24449_EDEKZA0031 2619 1_DE EN Information Connection and start up multicomp D6 xxx 7 System I English ...

Page 2: ...ser at all times e g in the switchgear cabinet Even if the device is resold to third parties the manual remains an inherent part of the device Although the utmost of care has been taken in putting together this user manual errors may still occur We would be very grateful if you could notify us of any errors or unclear descriptions you may notice Disclaimer The contents of these operating instructi...

Page 3: ...uct its operation or the respecti ve part of the operating instructions to which special reference is being made 1 3 Safety notes In order to prevent operating errors device operation is kept as simple as possible This will enable you to start your device up quickly In your own interest however the following safety notes should be read carefully The applicable DIN VDE regulations must be observed ...

Page 4: ...from the power supply Error detection repair and maintenance work may only be carried out in our facilities or after contacting our service team Opening the device unauthorized shall render your warranty null and void Correct operation can no longer be guaranteed Opening the device may expose live parts Capacitors in the device may still be under load even if the device has been disconnected from ...

Page 5: ...her the local power supply conditions comply with the specifications on the nameplate A faulty connection can lead to the destruction of the device A different power fre quency influences the measurement accordingly The device must be connected in accordance with the connection chart Systems that are at risk from lightning strikes must feature lightning protection for all input and output lines CA...

Page 6: ...red current will be negative Prerequisite is that energy is consumed Assignment measuring voltage input current transformer input The current transformer on terminal 20 21 k1 l1 must be arranged in the phase where the measuring voltage for terminal 10 L1 is measured The device will display positive current when connection and energy flow direction are correct If connected incorrectly the current d...

Page 7: ...max C2 automat max C2 Automat max 1 A slow blow max 1 A träge max C2 automat max C2 Automat max 1 A slow blow max 1 A träge circuit breaker Trennvorrichtung circuit breaker Trennvorrichtung PE For supply voltage see type plate Versorgungsspannung siehe Typenschild Netz power Messspannung measuring voltage Hauptstrom main current CAUTION The coil voltage for the capacitor contactors and the measuri...

Page 8: ...suring range from 500V to 30 0 KV Ph Ph 20 k1 and 21 l1 Measuring input for current The measuring input for current must be connected via a current transformer x 1A AC or x 5A AC When connecting the transformer pay attention to the energy flow direction and to the correct assignment of measuring volta ge input to current transformer 30 C and 31 S Floating relay contact This contact serves as a mes...

Page 9: ...ne helps you to correctly start up the compensation controller multicomp D6 xxx 7 It provides you with step by step instructions to help you find the options relevant for you in the operating instructions To begin with there are two cases in which the start up procedure for the multicomp D6 xxx 7 differs Case 1 You have bought a complete compensation system from KBR and the controller is already i...

Page 10: ...t up Detailed instructions for this step are given in chapter Settings under Modules Display submenu 2 Configuring current transformer values For the compensation controller to function properly all current transformer parameters have to be set correctly Primary and secondary current of the transformer have to be set These parameters can be read on the nameplate of the current transformer In addit...

Page 11: ...the circuit diagram cover sheet or the nameplate of the stage If the compensation unit consists of several cabinets the cabinet assignment should be adjusted accordingly Detailed instructions for this step are given in chapter Start up under Stages submenu 5 Function test After all values have been programmed a function test should be performed To do so the controller has to be taken off the volta...

Page 12: ...ter Start up under Transformer settings submenu 2 Function test After all values have been programmed a function test should be performed To do so the controller has to be taken off the voltage supply for a few seconds After re connecting it to the voltage supply the controller has to start automatically If the cosφ voltage is read out in the cosφ act menu immediately after switching it on the val...